Revision history of "M.E.A. AND XYTY MATURATION STUDIES IN SAMOTHRACE" (Q2770474)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 08:3408:34, 9 October 2024DG Regio talk contribs 55,069 bytes 0 Changed label, description and/or aliases in pt
  • curprev 08:3408:34, 9 October 2024DG Regio talk contribs 55,069 bytes +16 Set a claim value: summary (P836): O objetivo do projeto é a maturação dos estudos necessários para a implementação do projeto de Unidade de Tratamento de Resíduos (AIA) em Samotrácia (combinado e pré-selecionado organicamente), bem como para a implementação de um aterro sanitário que servirá a ilha de Samotrácia. Para a execução do projecto, serão realizados os seguintes estudos: Estudo Topográfico, Estudo Geotécnico – Investigação, Estudo Geológico, Estudo Ambiental, Estudo Prelimi...

20 March 2024

9 June 2023

21 December 2022

11 July 2022

  • curprev 06:0806:08, 11 July 2022DG Regio talk contribs 54,826 bytes +34,010 Changed label, description and/or aliases in da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, el, it, es, and other parts: Adding translations: da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

16 December 2021

5 December 2021

29 November 2021

  • curprev 10:0710:07, 29 November 2021DG Regio talk contribs 13,254 bytes +1,843 Created claim: summary (P836): Le but du projet est d’affiner les études nécessaires à la mise en œuvre du projet d’unité de traitement des déchets (WWU) à Samothraki (combiné et pré-trié organiquement) ainsi qu’à la mise en œuvre d’une décharge de résidus (HYTY) qui desservira l’île de Samothrace. Les études suivantes seront réalisées pour la mise en œuvre du projet: Étude topographique, étude géotechnique — Recherche, étude géologique, étude environnementale, étude prélimin...
  • curprev 10:0710:07, 29 November 2021DG Regio talk contribs 11,411 bytes +95 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 13:4913:49, 2 July 2021DG Regio talk contribs 11,305 bytes +107 Changed label, description and/or aliases in en: translated_label
  • curprev 13:4913:49, 2 July 2021DG Regio talk contribs 11,198 bytes +1,775 Created claim: summary (P836): The object of the project is the maturation of the necessary studies for the implementation of the Waste Processing Unit (AIA) project in Samothrace (combined and pre-selected organically) as well as for the implementation of a landfill site that will serve the island of Samothrace. The following studies will be carried out for the implementation of the project: Topographical Study, Geotechnical Study – Research, Geological Study, Environmental...

30 June 2021

22 June 2021