Revision history of "Extension, upgrading of bezodroms & creation of circular hubs" (Q2769312)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 08:3408:34, 9 October 2024DG Regio talk contribs 61,196 bytes +5 Changed label, description and/or aliases in pt
  • curprev 08:3408:34, 9 October 2024DG Regio talk contribs 61,191 bytes +27 Set a claim value: summary (P836): A ação está incluída na Estratégia de Desenvolvimento Urbano Sustentável aprovada da cidade de Trikala e diz respeito a intervenções de estética e modernização ambiental da zona urbana da cidade de Trikala. Em particular, inclui: 1. Intervenções na rua Kapodistrian com extensão dos pavimentos e integração na pista de ciclismo existente. A intervenção, no lado da pista de ciclismo, tem uma largura total de 3,80 m. Na calçada oposta o material de reve...

22 March 2024

12 June 2023

21 December 2022

28 July 2022

  • curprev 09:3509:35, 28 July 2022DG Regio talk contribs 60,937 bytes +38,009 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

14 January 2022

16 December 2021

5 December 2021

29 November 2021

  • curprev 10:0610:06, 29 November 2021DG Regio talk contribs 14,123 bytes +2,081 Created claim: summary (P836): La loi est incluse dans la stratégie de développement urbain durable approuvée de la ville de Trikala et concerne les interventions dans la modernisation esthétique et environnementale de l’espace urbain de la ville de Trikala. En particulier, il comprend:1. Interventions sur la rue Kapodistriou en étendant le trottoir et en y intégrant la piste cyclable existante. L’intervention, sur le côté de la piste cyclable, a une largeur totale de chaussé...
  • curprev 10:0610:06, 29 November 2021DG Regio talk contribs 12,042 bytes +126 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 13:3913:39, 2 July 2021DG Regio talk contribs 11,905 bytes +120 Changed label, description and/or aliases in en: translated_label
  • curprev 13:3913:39, 2 July 2021DG Regio talk contribs 11,785 bytes +2,027 Created claim: summary (P836): The action is included in the approved Sustainable Urban Development Strategy of the city of Trikala and concerns interventions of aesthetics and environmental upgrading of the urban area of the city of Trikala. In particular, it includes:1. Interventions on Kapodistrian street with extension of the pavements and integration on the existing cycling track. The intervention, on the side of the cycling track, has a total width of 3.80 m. On the opp...

30 June 2021

22 June 2021