Revision history of "SEWAGE AND WASTEWATER TREATMENT FACILITY D.D. BALMA" (Q2768352)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 22:4022:40, 8 October 2024DG Regio talk contribs 42,969 bytes −1 Changed label, description and/or aliases in pt
  • curprev 22:4022:40, 8 October 2024DG Regio talk contribs 42,970 bytes +9 Set a claim value: summary (P836): O projeto diz respeito à conclusão da rede de drenagem de águas residuais e da instalação de tratamento de resíduos (EEL), com uma capacidade de 8 200 habitantes da povoação de Palamas, na Tessália, e inclui:a) Parte do coletor S1 (de 25 de março até à Macedónia), com um comprimento total de 2 437,00 p.b.

20 March 2024

9 June 2023

21 December 2022

28 July 2022

  • curprev 09:2209:22, 28 July 2022DG Regio talk contribs 42,734 bytes +22,911 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

14 January 2022

16 December 2021

5 December 2021

29 November 2021

  • curprev 08:0708:07, 29 November 2021DG Regio talk contribs 12,218 bytes +1,780 Created claim: summary (P836): Le projet concerne l’achèvement du réseau d’égouts et de l’installation de traitement des eaux usées (WWD) d’une capacité de 8 200 habitants du village de Palamas, à Thessalie, et comprend:a) une partie du collecteur S1 (du 25 mars à la rue Macédoine), d’une longueur totale de 2.437,00 mb) Les sections verticales des collecteurs 1, 2 et 3 de la longueur totale 8,285 m. c) le réseau interne 1,126 m. d) Construction du réseau interne existant du c...
  • curprev 08:0708:07, 29 November 2021DG Regio talk contribs 10,438 bytes +148 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 12:5512:55, 2 July 2021DG Regio talk contribs 10,279 bytes +110 Changed label, description and/or aliases in en: translated_label
  • curprev 12:5512:55, 2 July 2021DG Regio talk contribs 10,169 bytes +1,117 Created claim: summary (P836): The project concerns the completion of the wastewater drainage network and the Waste Treatment Facility (EEL), with a capacity of 8,200 inhabitants of the Palamas settlement, in Thessaly and includes:(a) Part of the S1 collector (from 25 March to Macedonia), with a total length of 2.437.00 p.b., translated_summary

30 June 2021

22 June 2021