Revision history of "Energy Upgrading of the Public Building Karytaina" (Q2765363)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

12 June 2023

21 December 2022

11 July 2022

  • curprev 05:2205:22, 11 July 2022DG Regio talk contribs 45,315 bytes +27,105 Changed label, description and/or aliases in da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, el, it, es, and other parts: Adding translations: da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

16 December 2021

5 December 2021

29 November 2021

  • curprev 07:3307:33, 29 November 2021DG Regio talk contribs 12,313 bytes +1,435 Created claim: summary (P836): L’objectif du projet est l’amélioration de l’énergie (par au moins deux catégories énergétiques) d’un bâtiment municipal de Karytaina Arcadia et le développement de la sensibilisation à l’environnement parmi les étudiants et la communauté locale. Les travaux à réaliser concernent: a) Remplacement des fenêtres par un vitrage énergétique en bois, b) isolation thermique du toit, c) isolation thermique du bâtiment (interne), d) remplacement des pomp...
  • curprev 07:3307:33, 29 November 2021DG Regio talk contribs 10,878 bytes +124 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 12:1312:13, 2 July 2021DG Regio talk contribs 10,743 bytes +108 Changed label, description and/or aliases in en: translated_label
  • curprev 12:1312:13, 2 July 2021DG Regio talk contribs 10,635 bytes +1,319 Created claim: summary (P836): The aim of the project is the energy upgrade (by at least two energy categories) of a municipal building in Karytaina Arcadia and the development of environmental awareness among students and the local community. The work to be carried out concerns: A) Replacement of frames with wooden energy glazing, b) Thermal roof insulation, c) Building thermal insulation (internal), d) Replacement of scattered heat pumps and boiler with a central pump, e) R...

30 June 2021

22 June 2021