Revision history of "Upgrading DJ 172D: Muresenii Bargaului (DN 17) – Lake Colibita – Colibita – Bistrita Bargaului (DN17) – (DN17) Josenii Bargaului – Stramba – Ilva Mica (DN17D) – Poiana Ilvei – Magura Ilvei – Ilva Mare – Lunca Ilvei – Limita jud. Suce" (Q2745544)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 20:0720:07, 10 October 2024DG Regio talk contribs 56,609 bytes +6 Changed label, description and/or aliases in pt
  • curprev 20:0720:07, 10 October 2024DG Regio talk contribs 56,603 bytes +8 Set a claim value: summary (P836): O objetivo geral do projeto é aumentar a acessibilidade à rede RTE-T das zonas rurais do distrito de Bistrița-Năsăud localizadas perto da estrada europeia E58 (DN17), através da qual é assegurada a conectividade indireta aos corredores da RTE-T, através da modernização de um troço rodoviário contínuo do distrito de DJ172D (lote 2, lote 3, lote 4).

26 June 2024

  • curprev 08:1908:19, 26 June 2024DG Regio talk contribs 56,595 bytes −7 Set a claim value: summary (P836): L’objectif général du projet est d’accroître l’accessibilité au réseau RTE-T de certaines zones rurales du comté de Bistrita-Nasaud situées à proximité de la route européenne E58 (DN17), grâce à laquelle une connectivité indirecte aux corridors RTE-T est assurée, en modernisant un tronçon de route de comté continu de DJ172D (lot 2, lot 3, lot 4).

5 June 2024

23 March 2024

20 June 2023

10 June 2023

21 February 2023

21 December 2022

28 July 2022

  • curprev 07:2707:27, 28 July 2022DG Regio talk contribs 56,394 bytes +28,643 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

5 December 2021

1 December 2021

  • curprev 07:3307:33, 1 December 2021DG Regio talk contribs 23,066 bytes +1,180 Created claim: summary (P836): Allgemeines Ziel des Projekts ist es, den Zugang zum TEN-V-Netz der ländlichen Gebiete des Kreises Bistrița-Năsăud in der Nähe der Europäischen Straße E58 (DN17) zu verbessern, durch die eine indirekte Anbindung an die TEN-V-Korridore gewährleistet wird, indem ein durchgehender Kreisstraßenabschnitt von DJ172D (Los 2, Los 3, Los 4) ausgebaut wird., translated_summary
  • curprev 07:3307:33, 1 December 2021DG Regio talk contribs 21,886 bytes +356 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:2214:22, 26 November 2021DG Regio talk contribs 21,530 bytes +1,199 Created claim: summary (P836): Obiectivul general al proiectului este creșterea gradului de accesibilitate la Rețeaua TEN-T a unor zone rurale ale Județului Bistrița-Năsăud situate în proximitatea drumului european E58 (DN17), prin intermediul căruia se asigură conectivitatea indirectă la coridoarele TEN-T, prin modernizarea unui Tronson de drum județean continuu a DJ172D (lot 2, Lot 3, Lot 4)., translated_summary
  • curprev 09:4009:40, 26 November 2021DG Regio talk contribs 20,331 bytes +360 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

27 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021

21 June 2021

17 June 2021

15 June 2021