Revision history of "INTERVENTION WORKS IN ORDER TO INCREASE ENERGY PERFORMANCE AT THE “BISHOP NICOLAE POPOVICI” MUNICIPAL HOSPITAL THE BUILDINGS WITH NO. FALL. 103486-C1 AND NO. 103486-C14" (Q2745463)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 21:1121:11, 9 October 2024DG Regio talk contribs 66,643 bytes +6 Changed label, description and/or aliases in pt
  • curprev 21:1121:11, 9 October 2024DG Regio talk contribs 66,637 bytes +24 Set a claim value: summary (P836): O objetivo geral do projeto consiste em: Aumentar a eficiência energética do Hospital Municipal Dom Nicolae Popovici, em Beius, Stationar I, composto pelo «edifício antigo» e pelo «corpo acrescentado», tal como apresentado no relatório de auditoria energética. O presente projeto de aumento da eficiência energética propõe a aplicação de medidas de eficiência energética e a utilização de energias renováveis (para produzir a eletricidade necessária par...

26 June 2024

  • curprev 08:1908:19, 26 June 2024DG Regio talk contribs 66,613 bytes +192 Set a claim value: summary (P836): L’objectif général du projet est: Augmenter l’efficacité énergétique de l’hôpital municipal Nicolae Popovici à Beius, stationnaire I composé du «ancien bâtiment» et du «corps ajouté» tel que présenté dans le rapport d’audit énergétique. Le présent projet d’amélioration de l’efficacité énergétique propose la mise en œuvre de mesures d’efficacité énergétique et l’utilisation d’énergies renouvelables (pour la production d’électricité nécessaire à l’écl...

23 March 2024

10 June 2023

21 February 2023

28 July 2022

  • curprev 07:2507:25, 28 July 2022DG Regio talk contribs 67,181 bytes +42,071 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:2607:26, 1 December 2021DG Regio talk contribs 18,171 bytes +1,951 Created claim: summary (P836): Das übergeordnete Ziel des Projekts besteht darin, Erhöhung der Energieeffizienz des Gemeindekrankenhauses von Bischof Nicolae Popovici in Beius, stationar I bestehend aus dem „alten Gebäude“ und „Körper hinzugefügt“, wie im Energieauditbericht vorgestellt. Das vorliegende Projekt zur Steigerung der Energieeffizienz schlägt die Umsetzung von Energieeffizienzmaßnahmen und die Nutzung erneuerbarer Energien (zur Erzeugung des Strombedarfs für Beleu...
  • curprev 07:2607:26, 1 December 2021DG Regio talk contribs 16,220 bytes +218 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:2114:21, 26 November 2021DG Regio talk contribs 16,002 bytes +1,964 Created claim: summary (P836): Obiectivul general al proiectului este: Cresterea eficientei energye a Spitalului Municipal épiscop Nicolae Popovici din Beius, stationar I compus din «Cladirea veche» si «corp adaugat» asa cum sunt prezentate in raportul de Audit Energetic. Prin prezentul proiect de crestere a eficientei energye se propune implementationarea unor masuri de eficientizare energya si folosirea energiilor regenerabile (pentru producerea energiei electrice necesare...
  • curprev 09:4009:40, 26 November 2021DG Regio talk contribs 14,038 bytes +239 Changed label, description and/or aliases in fr: translated_label

7 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

14 September 2021

21 June 2021

17 June 2021

  • curprev 12:1212:12, 17 June 2021DG Regio talk contribs 10,687 bytes +232 Changed label, description and/or aliases in en: translated_label
  • curprev 12:1212:12, 17 June 2021DG Regio talk contribs 10,455 bytes +1,230 Created claim: summary (P836): Through this project to increase energy efficiency, we propose the implementation of energy efficiency measures and the use of renewable energies (to produce electricity needed for lighting, air conditioning and domestic hot water) which will lead to an optimised use of local energy resources for heating, domestic hot water, ventilation and lighting with sustainable effects to protect the surrounding mill, translated_summary

15 June 2021