Revision history of "Energy efficiency works at Orastie Municipal Hospital" (Q2744892)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 08:2108:21, 10 October 2024DG Regio talk contribs 50,441 bytes −9 Changed label, description and/or aliases in pt
  • curprev 08:2108:21, 10 October 2024DG Regio talk contribs 50,450 bytes +2 Set a claim value: summary (P836): Melhoria da eficiência energética, gestão inteligente da energia, redução das emissões de carbono e utilização de energias renováveis no City City Hospital através de obras específicas. Com as medidas previstas, no final da execução do projeto, o consumo anual de energia primária no Hospital Municipal de Orastie será reduzido de 3008847,17 kwh/ano para 808189,70 kwh/ano (redução de 73,14 %) e o nível anual de gases com efeito de estufa (equivalente...

26 June 2024

  • curprev 08:1608:16, 26 June 2024DG Regio talk contribs 50,448 bytes +54 Set a claim value: summary (P836): Améliorer l’efficacité énergétique, la gestion intelligente de l’énergie, réduire les émissions de carbone et utiliser l’énergie produite à partir de sources renouvelables de l’hôpital municipal par le biais de travaux spécifiques. Par les mesures envisagées, à la fin de la mise en œuvre du projet, la consommation annuelle d’énergie primaire à l’hôpital municipal d’Orastie sera réduite de 3 008 847,17 kWh/an à 808189,70 kwh/an (réduction de 73,14 %)...

5 June 2024

20 March 2024

10 June 2023

21 February 2023

28 July 2022

  • curprev 07:0907:09, 28 July 2022DG Regio talk contribs 50,640 bytes +29,965 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 06:5606:56, 1 December 2021DG Regio talk contribs 15,798 bytes +1,446 Created claim: summary (P836): Verbesserung der Energieeffizienz, intelligentes Energiemanagement, Verringerung der CO2-Emissionen und Nutzung erneuerbarer Energien im City Hospital durch spezifische Arbeiten. Mit den geplanten Maßnahmen wird der jährliche Primärenergieverbrauch im Gemeindekrankenhaus Orastie am Ende der Projektdurchführung von 3008847,17 kwh/Jahr auf 808189,70 kwh/Jahr (Verringerung von 73,14 %) und die jährlichen Treibhausgasemissionen (entspricht Tonnen CO...
  • curprev 06:5606:56, 1 December 2021DG Regio talk contribs 14,352 bytes +112 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:1914:19, 26 November 2021DG Regio talk contribs 14,240 bytes +1,497 Created claim: summary (P836): Imbunatatirea eficientei energye, a gestionarii inteligente a energiei, a reducerii emisiilor de carbon si a utilizarii energiei din Surse regenerabile a Spitalului Municipal Orastie prin Lucrari specifice. Prin masurile preconizate, la finalul implementationarii proiectului, consumul anual de energie Primara la nivelul Spitalului Municipal Orastie se va reduce de la 3008847,17 kwh/an la 808189,70 kwh/an (reducere de 73,14 %) iar nivelul anual a...
  • curprev 09:3609:36, 26 November 2021DG Regio talk contribs 12,743 bytes +137 Changed label, description and/or aliases in fr: translated_label

7 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

14 September 2021

21 June 2021

17 June 2021

  • curprev 12:0312:03, 17 June 2021DG Regio talk contribs 11,339 bytes +112 Changed label, description and/or aliases in en: translated_label
  • curprev 12:0312:03, 17 June 2021DG Regio talk contribs 11,227 bytes +1,346 Created claim: summary (P836): Specific works applied to the thermal insulation of the hospital building envelopes (outdoor walls, windows, carpentry, floor above the last floor floor over the basement, etc.), of sarpents and wrappers including finishing works, by installing a modern mechanical ventilation system with energy recovery, by replacing the installations for preparing, distributing and using the heating agent for heating and hot water, installing high energy valves...

15 June 2021