Revision history of "Rehabilitation, modernisation, extension and endowment of “Hercules” High School" (Q2744716)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 20:0220:02, 10 October 2024DG Regio talk contribs 66,962 bytes +7 Changed label, description and/or aliases in pt
  • curprev 20:0220:02, 10 October 2024DG Regio talk contribs 66,955 bytes −6 Set a claim value: summary (P836): O objetivo geral do projeto é alcançar uma intervenção ao nível da infraestrutura educativa da escola tecnológica «Hercules» High School em Baile Herculane, a fim de contribuir para a melhoria da infraestrutura educativa e aumentar o grau de participação no ensino técnico a nível local. O projeto de investimento proposto foi desenvolvido associando os objetivos estabelecidos aos objetivos da prioridade de investimento financiada pelo POR 2014-2020,...

26 June 2024

  • curprev 08:1508:15, 26 June 2024DG Regio talk contribs 66,961 bytes +45 Set a claim value: summary (P836): L’objectif général du projet est la réalisation d’une intervention au niveau de l’infrastructure éducative de l’unité d’enseignement technologique «Hercules» High School à Baile Herculane, afin de contribuer à l’amélioration de l’infrastructure éducative et à l’augmentation du degré de participation à l’enseignement de lavelure Tevelnic. Le projet d’investissement proposé a été développé en corrélant les objectifs fixés avec les objectifs de la prio...

5 June 2024

23 March 2024

10 June 2023

21 February 2023

28 July 2022

  • curprev 07:0407:04, 28 July 2022DG Regio talk contribs 67,145 bytes +41,456 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:3207:32, 1 December 2021DG Regio talk contribs 18,801 bytes +2,144 Created claim: summary (P836): Das allgemeine Ziel des Projekts ist es, eine Intervention auf der Ebene der Bildungsinfrastruktur der technologischen Schule „Hercules“ High School in Baile Herculane zu erreichen, um zur Verbesserung der Bildungsinfrastruktur beizutragen und den Grad der Teilnahme an der technischen Bildung auf lokaler Ebene zu erhöhen. Das vorgeschlagene Investitionsvorhaben wurde entwickelt, indem die Ziele mit den Zielen der Investitionspriorität, die im Ra...
  • curprev 07:3207:32, 1 December 2021DG Regio talk contribs 16,657 bytes +149 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:1814:18, 26 November 2021DG Regio talk contribs 16,508 bytes +2,259 Created claim: summary (P836): Obiectivul general al proiectului îl reprezintă realizarea uni intervenţii la nivelul Infrastructurii educaţionale a unităţii de Învăţământ cu profil Tehnologic Liceul «Hercules» din Oraşul Băile Herculane, pentru a contribui la îmbunătătăirea Infrastructurii educaţionale şi creşterea gradului de participare la Învăţământul tevelnic de lavel. Proiectul de investiţii Propus a fost elaborat prin corelarea obiectivelor stabilite cu obiectivele prio...
  • curprev 09:3509:35, 26 November 2021DG Regio talk contribs 14,249 bytes +150 Changed label, description and/or aliases in fr: translated_label

7 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

14 September 2021

21 June 2021

17 June 2021

  • curprev 12:0112:01, 17 June 2021DG Regio talk contribs 10,656 bytes +143 Changed label, description and/or aliases in en: translated_label
  • curprev 12:0112:01, 17 June 2021DG Regio talk contribs 10,513 bytes +1,079 Created claim: summary (P836): Carrying out an intervention in the educational infrastructure of the technological education unit “Hercules” High School in Baile Herculane, in order to help improve the educational infrastructure and increase participation in local technical education, translated_summary

15 June 2021