Revision history of "Modernisation of DJ 709 Pîncota -Seleus and Rehabilitation DJ 792 Nădab-Seleuș" (Q2744599)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 20:0220:02, 10 October 2024DG Regio talk contribs 63,667 bytes +15 Set a claim value: summary (P836): Objectivo geral do projecto: ligação das localidades de Pîncota, Seleuș, Zărand, Sintea Mică e Cintei à rede RTE-T. A realização do projeto proposto pela UAT do condado de Arad contribuirá para a realização do objetivo específico do eixo prioritário 6, a saber, aumentar a acessibilidade das zonas rurais e urbanas situadas perto da rede RTE-T através da modernização das estradas do condado. O objetivo geral do projeto, bem como o objetivo específico,...

26 June 2024

  • curprev 08:1608:16, 26 June 2024DG Regio talk contribs 63,652 bytes +31 Set a claim value: summary (P836): Objectif général du projet: Relier Pîncota, Seleuş, Zărand, Sintea Mică et Cintei au réseau RTE-T. La mise en œuvre du projet proposé par le comté d’UAT Arad contribuera à la réalisation de l’objectif spécifique de l’axe prioritaire 6, à savoir améliorer l’accessibilité des zones rurales et urbaines situées à proximité du réseau RTE-T en modernisant les routes du comté. L’objectif général du projet ainsi que l’objectif spécifique sont subordonnés au...

12 March 2024

10 June 2023

21 February 2023

28 July 2022

  • curprev 07:0007:00, 28 July 2022DG Regio talk contribs 64,379 bytes +39,503 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

5 December 2021

1 December 2021

  • curprev 07:2607:26, 1 December 2021DG Regio talk contribs 18,216 bytes +2,097 Created claim: summary (P836): Allgemeines Ziel des Projekts: Anbindung der Ortschaften Pîncota, Seleuș, Zărand, Sintea Mică und Cintei an das TEN-V-Netz. Die Durchführung des von der ATU Arad vorgeschlagenen Projekts wird zur Verwirklichung des spezifischen Ziels der Prioritätsachse 6 beitragen, nämlich die Zugänglichkeit ländlicher und städtischer Gebiete in der Nähe des TEN-V-Netzes durch Modernisierung der Landstraßen zu verbessern. Das allgemeine Ziel des Projekts sowie...
  • curprev 07:2607:26, 1 December 2021DG Regio talk contribs 16,119 bytes +138 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:1814:18, 26 November 2021DG Regio talk contribs 15,981 bytes +2,065 Created claim: summary (P836): Obiectivul general al proiectului: Conectarea localităţilor Pîncota, Seleuş, Zărand, Sintea Mică şi Cintei la reţeaua TEN-T. Realizarea proiectului Propus de UAT Judeţul Arad va contribui la atingerea obiectivului specific al axei Prioritare 6, şi anume creşterea gradului de accesibilitate a zonelor rurale şi urbane situate în proximitatea reţelei TEN-T prin modernizarea drumurilor juţene. Obiectivul general al proiectului precum şi Obiectivul s...
  • curprev 09:3409:34, 26 November 2021DG Regio talk contribs 13,916 bytes +137 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

27 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021

21 June 2021

17 June 2021

  • curprev 11:5811:58, 17 June 2021DG Regio talk contribs 9,438 bytes +140 Changed label, description and/or aliases in en: translated_label
  • curprev 11:5811:58, 17 June 2021DG Regio talk contribs 9,298 bytes +1,171 Created claim: summary (P836): A section of the county road DJ 709 will be modernised between Pîncota and Seleuș commune, between km 33+ 700-39+ 205. A section of DJ 792 will be rehabilitated between Nădab and Seleus, km 7+ 380-26+ 190. The route connects localities that are located to the east of the 79 National Road Arad – Oradea to the extended TEN-T infrastructure., translated_summary

15 June 2021