Revision history of "Expansion and efficiency of public lighting in Pecica and the villages belonging to the city" (Q2744580)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 08:2108:21, 10 October 2024DG Regio talk contribs 47,309 bytes −8 Set a claim value: summary (P836): O objetivo geral do projeto intitulado «Alargamento e eficiência da iluminação pública na cidade de Pecica e nas suas aldeias» é aumentar a eficiência energética do sistema de iluminação pública existente ao nível da cidade de Pecica, distrito de Arad (incluindo ao nível das aldeias circundantes) e realizar atividades para alargar este sistema, com especial destaque para a necessidade de incluir sistemas energéticos alternativos e soluções técnicas...

26 June 2024

  • curprev 08:1508:15, 26 June 2024DG Regio talk contribs 47,317 bytes +51 Set a claim value: summary (P836): L’objectif général du projet intitulé «Extension et efficacité de l’éclairage public dans la ville de Pecica et ses villages» est d’accroître l’efficacité énergétique du système d’éclairage public existant dans la ville de Pecica, comté d’Arad (y compris les villages qui lui appartiennent) et de mener des activités visant à étendre ce système en mettant l’accent sur la nécessité d’inclure dans l’objectif d’investissement des systèmes énergétiques al...

7 March 2024

10 June 2023

21 February 2023

28 July 2022

  • curprev 07:0007:00, 28 July 2022DG Regio talk contribs 48,033 bytes +28,075 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:2107:21, 1 December 2021DG Regio talk contribs 15,436 bytes +1,371 Created claim: summary (P836): Das allgemeine Ziel des Projekts „Erweiterung und Effizienz der öffentlichen Beleuchtung in der Stadt Pecica und ihren Dörfern“ ist die Steigerung der Energieeffizienz in der öffentlichen Beleuchtungsanlage, die auf der Ebene von Pecica City, Arad County (auch auf Ebene der umliegenden Dörfer) vorhanden ist, und die Durchführung von Aktivitäten zur Erweiterung dieses Systems mit einem sorgfältigen Fokus auf die Notwendigkeit alternativer Energie...
  • curprev 07:2107:21, 1 December 2021DG Regio talk contribs 14,065 bytes +164 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:1214:12, 26 November 2021DG Regio talk contribs 13,901 bytes +1,340 Created claim: summary (P836): Obiectivul general al proiectului intitulat,Extindere si eficientizare iluminat public in orasul Pecica si satele apartinatoare" consta in creșterea eficienței energye in sistemul de iluminat public existent la nivelul Orasului Pecica, judetul Arad (inclusiv la nivelul satelor apartinatoare) si realizarea de activitati de extindere a acestui sistem cu aplecarea atenta asupra necesitatii cuprinderii in Obiectivul investitional a unor sisteme de e...
  • curprev 09:3409:34, 26 November 2021DG Regio talk contribs 12,561 bytes +162 Changed label, description and/or aliases in fr: translated_label

7 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

14 September 2021

21 June 2021

17 June 2021

15 June 2021