Revision history of "Landscape Park Stirbei Voda" (Q2744377)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 22:3822:38, 8 October 2024DG Regio talk contribs 62,455 bytes 0 Changed label, description and/or aliases in pt
  • curprev 22:3822:38, 8 October 2024DG Regio talk contribs 62,455 bytes +16 Set a claim value: summary (P836): A definição do objetivo geral do projeto de desenvolvimento do Parque Ştirbei Voda estava em consonância com os objetivos do POR 2014-2020 do eixo prioritário 4 – «Apoio ao desenvolvimento urbano sustentável», da prioridade de investimento 4.2 «Ações destinadas a melhorar o ambiente urbano, revitalizar as cidades, regenerar e descontaminar os espaços industriais abandonados (incluindo as zonas de reconversão), reduzir a poluição atmosférica e promov...

26 June 2024

  • curprev 08:1508:15, 26 June 2024DG Regio talk contribs 62,439 bytes −45 Set a claim value: summary (P836): L’objectif global du projet de développement du parc Ştirbei Vodă a été établi conformément aux objectifs du ROP 2014-2020, axe prioritaire 4 «Soutien au développement urbain durable», priorité d’investissement 4.2 «Actions visant à améliorer l’environnement urbain, à revitaliser les villes, à régénérer et à décontamination les friches industrielles (y compris les zones de transformation), à réduire la pollution atmosphérique et à promouvoir des mes...

22 March 2024

10 June 2023

21 February 2023

28 July 2022

  • curprev 06:5406:54, 28 July 2022DG Regio talk contribs 63,266 bytes +38,781 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 07:1407:14, 1 December 2021DG Regio talk contribs 18,051 bytes +2,077 Created claim: summary (P836): Die Festlegung des allgemeinen Ziels des Projekts zur Entwicklung des Parks Ştirbei Voda stand im Einklang mit den Zielen der Prioritätsachse 4 „Förderung einer nachhaltigen Stadtentwicklung“, der Investitionspriorität 4.2 „Maßnahmen zur Verbesserung der städtischen Umwelt, zur Revitalisierung der Städte, zur Sanierung und Dekontaminierung von Brachflächen (einschließlich Umgestaltungsgebieten), zur Verringerung der Luftverschmutzung und zur För...
  • curprev 07:1407:14, 1 December 2021DG Regio talk contribs 15,974 bytes +88 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 14:1214:12, 26 November 2021DG Regio talk contribs 15,886 bytes +2,104 Created claim: summary (P836): Stabilirea obiectivului general al proiectului Amenajare Parc Ştirbei Vodă s-a făcut în concordanţă cu obiectivele POR 2014-2020, ale axei prioritare 4 -«sprijinirea dezvoltării urbane durabile», Prioritatea de investiţii 4.2 «Realizarea de acţiuni destinate îmbunătătăţirii mediului urban, revitalizării oraşelor, regenerării şi decontaminării terenurilor industriale dezafectate(inclusiv a zonelor de Reconversie), reducerii poluării aerului şi pr...
  • curprev 09:3209:32, 26 November 2021DG Regio talk contribs 13,782 bytes +88 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

27 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021

21 June 2021

17 June 2021

  • curprev 11:5211:52, 17 June 2021DG Regio talk contribs 9,710 bytes +86 Changed label, description and/or aliases in en: translated_label
  • curprev 11:5211:52, 17 June 2021DG Regio talk contribs 9,624 bytes +1,168 Created claim: summary (P836): The project “Arrangement of Stirbei Voda Park” involves:growth of green surfaces, at the level of the municipality, amid reintegration into the urban circuit of its residual spaces: – area created green spaces: 9392 sq.m;- surface of open rehabilitated space: 10.423 sqm;- the project will not create, modernise, rehabilitate urban streets., translated_summary

15 June 2021