Revision history of "Improving connectivity in the southern part of Mehedinti county" (Q2744032)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

26 June 2024

22 March 2024

10 June 2023

21 February 2023

28 July 2022

  • curprev 06:4306:43, 28 July 2022DG Regio talk contribs 38,007 bytes +20,821 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

26 November 2021

7 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

14 September 2021

21 June 2021

17 June 2021

  • curprev 11:5011:50, 17 June 2021DG Regio talk contribs 10,108 bytes +122 Changed label, description and/or aliases in en: translated_label
  • curprev 11:5011:50, 17 June 2021DG Regio talk contribs 9,986 bytes +1,151 Created claim: summary (P836): DJ 562B Vrata-Cujmir, km 0+ 000-6+ 726 – rehabilitation with reprofiling layer of asphalt mortar and geocomposite, connection layer and wear layer with the following geometric elements:- Width roadside = 6 m- lateral platform = 7,50 m-0 % width of constructions, 5 % Landscapes = 4 % phantoms = 562 % roadsides = 3.288 % pcs., translated_summary

15 June 2021