Revision history of "Modernisation of regional transport infrastructure on the Niculitel and Turda-Sarichioi route" (Q2742474)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 08:2108:21, 10 October 2024DG Regio talk contribs 114,357 bytes 0 Changed label, description and/or aliases in pt
  • curprev 08:2108:21, 10 October 2024DG Regio talk contribs 114,357 bytes +77 Set a claim value: summary (P836): Pela sua localização geográfica, Tulcea County, o maior condado do país está localizado na parte sudeste da Roménia, limitado a oeste e norte pelo Danúbio, e a leste pelo Mar Negro, é uma área periférica com um elevado grau de isolamento. O projeto proposto para financiamento é uma prioridade para alcançar os objetivos previstos na Estratégia Integrada de Desenvolvimento Sustentável do distrito de Tulcea para o Plano de Desenvolvimento Regional 2014...

26 June 2024

  • curprev 08:1208:12, 26 June 2024DG Regio talk contribs 114,280 bytes +232 Set a claim value: summary (P836): En raison de sa position géographique, le comté de Tulcea, le plus grand comté du pays, est situé dans la partie sud-est de la Roumanie, bordée à l’ouest et au nord par le Danube, et à l’est par la mer Noire, constitue une zone périphérique avec un degré élevé d’isolement. Le projet proposé pour un financement est une priorité pour la réalisation des objectifs prévus par la stratégie intégrée de développement durable du comté de Tulcea pour la pério...

7 March 2024

19 June 2023

10 June 2023

21 February 2023

21 December 2022

28 July 2022

  • curprev 05:5505:55, 28 July 2022DG Regio talk contribs 114,369 bytes +71,920 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 06:3106:31, 1 December 2021DG Regio talk contribs 30,436 bytes +3,853 Created claim: summary (P836): Durch seine geografische Lage, Tulcea County, die größte Grafschaft des Landes befindet sich im südöstlichen Teil Rumäniens, im Westen und Norden an die Donau begrenzt, und im Osten an das Schwarze Meer, ist es ein peripheres Gebiet mit einem hohen Grad an Isolation. Das für eine Finanzierung vorgeschlagene Projekt ist eine Priorität für die Verwirklichung der Ziele, die in der integrierten Strategie für nachhaltige Entwicklung des Landkreises T...
  • curprev 06:3106:31, 1 December 2021DG Regio talk contribs 26,583 bytes +156 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 13:5413:54, 26 November 2021DG Regio talk contribs 26,427 bytes +3,940 Created claim: summary (P836): Prin poziţionarea sa geografică, judeţul Tulcea, cel mai întins județ al țării este situat în partea de sud-est a României, mărginit la vest şi nord de Dunăre, iar la est de Marea Neagră, constituie o zonă periferică cu un grad de izolare ridicat. Proiectul Propus spre finanţare reprezintă o prioritate pentru atingerea obiectivelor avute în vedere prin Strategia integrată de dezvoltare durabilă a judeţului Tulcea pe perioada 2014-2020 Planul de...
  • curprev 09:1909:19, 26 November 2021DG Regio talk contribs 22,487 bytes +160 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

27 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021

21 June 2021

17 June 2021

  • curprev 11:2311:23, 17 June 2021DG Regio talk contribs 10,564 bytes +152 Changed label, description and/or aliases in en: translated_label
  • curprev 11:2311:23, 17 June 2021DG Regio talk contribs 10,412 bytes +1,406 Created claim: summary (P836): 1.Modernisation activity of regional transport infrastructure on the route DJ 229 Niculitelel and Turda – Sarichioi on a length of 28.864 km; The projected works consist mainly of: modernisation of the road, dimensioning of the road system, flooring, arrangement of intersections and side roads, arrangement of access to properties, protection of disabled persons, arrangement of bus stations, works to increase road safety, horizontal and vertical...

15 June 2021