Revision history of "Upgrading the county road infrastructure, between the county limits Buzau-Voetin-Sihlea-Obrejita-Timboiesti-Bordesti with direct connectivity to the TEN-T network" (Q2741917)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 21:1121:11, 9 October 2024DG Regio talk contribs 51,647 bytes +7 Changed label, description and/or aliases in pt
  • curprev 21:1121:11, 9 October 2024DG Regio talk contribs 51,640 bytes −4 Set a claim value: summary (P836): O objetivo geral a alcançar com a execução deste projeto de investimento é alcançar uma ligação rápida e segura à rede europeia de transportes RTE-T. O objetivo é aumentar as condições para o desenvolvimento sustentável da zona, facilitando a mobilidade de pessoas e mercadorias, desenvolvendo a acessibilidade, expandindo e modernizando ainda mais as infraestruturas rodoviárias próximas da rede RTE-T e criando um sistema de transportes multimodal.

26 June 2024

  • curprev 08:1608:16, 26 June 2024DG Regio talk contribs 51,644 bytes −18 Set a claim value: summary (P836): L’objectif global à atteindre par la mise en œuvre de ce projet d’investissement est d’assurer une connexion rapide et sécurisée au réseau européen de transport RTE-T. L’objectif est d’accroître les conditions d’un développement durable de la zone en facilitant la mobilité des personnes et des marchandises, en développant l’accessibilité, en poursuivant l’expansion et la modernisation des infrastructures routières à proximité du réseau RTE-T, en cré...

20 March 2024

10 June 2023

21 February 2023

21 December 2022

28 July 2022

  • curprev 05:3905:39, 28 July 2022DG Regio talk contribs 53,664 bytes +28,374 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 06:5006:50, 1 December 2021DG Regio talk contribs 20,645 bytes +1,351 Created claim: summary (P836): Das allgemeine Ziel, das mit der Durchführung dieses Investitionsvorhabens zu erreichen ist, besteht darin, eine schnelle und sichere Anbindung an das europäische TEN-V-Verkehrsnetz zu erreichen. Ziel ist es, die Bedingungen für eine nachhaltige Entwicklung des Gebiets zu verbessern, indem die Mobilität von Personen und Gütern erleichtert, die Zugänglichkeit verbessert, die Straßeninfrastruktur in der Nähe des TEN-V-Netzes durch die Schaffung ei...
  • curprev 06:5006:50, 1 December 2021DG Regio talk contribs 19,294 bytes +215 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 13:5213:52, 26 November 2021DG Regio talk contribs 19,079 bytes +1,365 Created claim: summary (P836): Obiectivul general ce se doreşte a fi Atins prin implementationarea PREZENTULUI proiect investițional este realizarea unei Legaturi rapide si in siguranţa la reţeaua de transport europeana TEN-T. Scopul realizarii obiectivului este creşterea condiţiilor de dezvoltare durabilă a Zonei prin facilitarea mobilității populaţiei și bunurilor, dezvoltarea accesibilității, prin continuarea extinderii și modernizării Infrastructurii rutiere aflate în pro...
  • curprev 09:1609:16, 26 November 2021DG Regio talk contribs 17,714 bytes +212 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

27 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021

21 June 2021

17 June 2021

  • curprev 11:1411:14, 17 June 2021DG Regio talk contribs 10,681 bytes +1,386 Created claim: summary (P836): Upgrading the county road infrastructure 202E by upgrading/rehabilitation of 22.517 km pavement length/walk paths 10.104 km, public transport stations and built alveoli, providing additional elements for traffic safety: 198.00 ml metal parapet, 22.60 km markings, 40 pedestrian crossings provided with bright amenities, 4 locality with sets of 6 resonating bands, 2 bridges will be modernised (bridge km 8+ 720 and bridge km 15+ 660). Bevelled curbs...
  • curprev 11:1411:14, 17 June 2021DG Regio talk contribs 9,295 bytes −1,386 Removed claim: summary (P836): Upgrading the county road infrastructure 202E by upgrading/rehabilitation of 22.517 km pavement length/walk paths 10.104 km, public transport stations and built alveoli, providing additional elements for traffic safety: 198.00 ml metal parapet, 22.60 km markings, 40 pedestrian crossings provided with bright amenities, 4 locality with sets of 6 resonating bands, 2 bridges will be modernised (bridge km 8+ 720 and bridge km 15+ 660). Bevelled cur...
  • curprev 11:1311:13, 17 June 2021DG Regio talk contribs 10,681 bytes +222 Changed label, description and/or aliases in en: translated_label
  • curprev 11:1311:13, 17 June 2021DG Regio talk contribs 10,459 bytes +1,386 Created claim: summary (P836): Upgrading the county road infrastructure 202E by upgrading/rehabilitation of 22.517 km pavement length/walk paths 10.104 km, public transport stations and built alveoli, providing additional elements for traffic safety: 198.00 ml metal parapet, 22.60 km markings, 40 pedestrian crossings provided with bright amenities, 4 locality with sets of 6 resonating bands, 2 bridges will be modernised (bridge km 8+ 720 and bridge km 15+ 660). Bevelled curbs...

15 June 2021