Revision history of "NORTH-EAST REGION – STRATEGIC ROAD AXIS 1: IASI-SUCEAVA" (Q2741237)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 21:1121:11, 9 October 2024DG Regio talk contribs 88,749 bytes +1 Changed label, description and/or aliases in pt
  • curprev 21:1121:11, 9 October 2024DG Regio talk contribs 88,748 bytes −2 Set a claim value: summary (P836): O objetivo geral do projeto é melhorar a acessibilidade e a mobilidade da população, dos bens e dos serviços, a fim de estimular o desenvolvimento económico sustentável, modernizando 167 933 km de estradas distritais nos distritos de Iași e Suceava perto da RTE-T e ligando 22 unidades administrativas e territoriais urbanas e rurais à rede RTE-T. Assim, através da execução do projeto «Região Nordeste – Eixo Rodoviário Estratégico 1: Iasi – Suceava",...

5 June 2024

22 March 2024

10 June 2023

21 February 2023

28 July 2022

  • curprev 05:1905:19, 28 July 2022DG Regio talk contribs 88,591 bytes +56,646 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

15 December 2021

5 December 2021

1 December 2021

  • curprev 06:2106:21, 1 December 2021DG Regio talk contribs 22,843 bytes +2,944 Created claim: summary (P836): Allgemeines Ziel des Projekts ist es, die Zugänglichkeit und Mobilität der Bevölkerung, Güter und Dienstleistungen zu verbessern, um eine nachhaltige wirtschaftliche Entwicklung zu fördern, indem 167,933 km der Kreisstraßen in Iași und Suceava in der Nähe von TEN-V modernisiert und 22 städtische und ländliche Verwaltungseinheiten mit dem TEN-V-Netz verbunden werden. Iasi – Suceava" wird die erzielten Ergebnisse erzielen, indem die in Prioritätsa...
  • curprev 06:2106:21, 1 December 2021DG Regio talk contribs 19,899 bytes +119 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 08:4308:43, 26 November 2021DG Regio talk contribs 19,780 bytes +2,960 Created claim: summary (P836): L’objectif général du projet est d’améliorer l’accessibilité et la mobilité de la population, des biens et des services, afin de stimuler le développement économique durable, en modernisant 167,933 km de routes départementales dans les comtés d’Iași et de Suceava à proximité du RTE-T et en reliant 22 unités administratives et territoriales urbaines et rurales au réseau RTE-T. Iasi — Suceava", obtiendra les résultats visés par la promotion des in...
  • curprev 08:4308:43, 26 November 2021DG Regio talk contribs 16,820 bytes +120 Changed label, description and/or aliases in fr: translated_label

7 October 2021

6 October 2021

5 October 2021

27 September 2021

23 September 2021

14 September 2021

21 June 2021

17 June 2021

  • curprev 11:0011:00, 17 June 2021DG Regio talk contribs 10,214 bytes +116 Changed label, description and/or aliases in en: translated_label
  • curprev 11:0011:00, 17 June 2021DG Regio talk contribs 10,098 bytes +1,120 Created claim: summary (P836): Improving accessibility and mobility of population, goods and services, in order to stimulate sustainable economic development, by modernising 167.933 km of county roads in Iasi and Suceava counties near TEN-T and connecting 22 urban and rural administrative-territorial units to the TEN-T network., translated_summary

15 June 2021