Revision history of "Upgrading the Risk Management System — Phase II" (Q2736043)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

13 June 2023

1 June 2023

12 October 2022

11 July 2022

  • curprev 04:2704:27, 11 July 2022DG Regio talk contribs 50,718 bytes +30,319 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:3620:36, 29 November 2021DG Regio talk contribs 15,728 bytes +1,465 Created claim: summary (P836): Die Tätigkeiten dieses Vorhabens stellen die Verbesserung des Risikomanagementsystems der Phase II dar (bestehend aus mehreren unabhängigen Modulen, die aufgerüstet werden sollen) mit dem Ziel, Wartung und Modernisierung zu gewährleisten. Es ist notwendig, die volle Funktionalität und den ordnungsgemäßen Betrieb jedes Moduls sicherzustellen und Fehler durch präventive und Notfall-Wartung zu beseitigen, und durch proaktive Maßnahmen ist es notwen...
  • curprev 20:3620:36, 29 November 2021DG Regio talk contribs 14,263 bytes +112 Changed label, description and/or aliases in de: translated_label
  • curprev 10:3510:35, 29 November 2021DG Regio talk contribs 14,151 bytes +1,535 Created claim: summary (P836): Les activités de cette opération représentent l’amélioration de la phase II du système de gestion des risques (composée de plusieurs modules indépendants à mettre à niveau) réalisées dans le but d’assurer la maintenance et la mise à niveau. Il est nécessaire d’assurer la pleine fonctionnalité et le bon fonctionnement de chaque module, d’éliminer les erreurs par la maintenance préventive et d’urgence, et par le biais d’une démarche proactive, il...

26 November 2021

21 June 2021

3 June 2021

  • curprev 13:4613:46, 3 June 2021DG Regio talk contribs 12,065 bytes +1,448 Created claim: summary (P836): The activities of this operation constitute stage II of the improvement of the Risk Management System (composed of several independent modules that are being upgraded) and which are carried out in order to provide the maintenance and upgrade service. It is necessary to ensure the full functionality and functioning of each individual module, to eliminate errors through prevention and intervention by means of preventive and intervention maintenanc...
  • curprev 13:4513:45, 3 June 2021DG Regio talk contribs 10,617 bytes −1,448 Removed claim: summary (P836): The activities of this operation constitute stage II of the improvement of the Risk Management System (composed of several independent modules that are being upgraded) and which are carried out in order to provide the maintenance and upgrade service. It is necessary to ensure the full functionality and functioning of each individual module, to eliminate errors through prevention and intervention by means of preventive and intervention maintena...
  • curprev 13:4513:45, 3 June 2021DG Regio talk contribs 12,065 bytes +108 Changed label, description and/or aliases in en: translated_label
  • curprev 13:4513:45, 3 June 2021DG Regio talk contribs 11,957 bytes +1,448 Created claim: summary (P836): The activities of this operation constitute stage II of the improvement of the Risk Management System (composed of several independent modules that are being upgraded) and which are carried out in order to provide the maintenance and upgrade service. It is necessary to ensure the full functionality and functioning of each individual module, to eliminate errors through prevention and intervention by means of preventive and intervention maintenanc...

2 June 2021