Revision history of "Forest ride" (Q2734748)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 19:2319:23, 7 October 2024DG Regio talk contribs 46,257 bytes +2 Set a claim value: summary (P836): O projeto Forest ride está previsto para construir uma nova infraestrutura pedonal para bicicletas com Zaprešić — uma faixa até à rua industrial, e ligá-la a um «percurso pedestre para ciclistas» existente na estação ferroviária «New Castle» e expandir a infraestrutura existente para bicicletas copedestres, abrindo assim caminho para um melhor desenvolvimento do transporte intermodal e aumentando o número de utilizadores de transportes públicos atra...

12 August 2024

7 March 2024

11 June 2023

1 June 2023

12 October 2022

26 September 2022

11 July 2022

  • curprev 03:5503:55, 11 July 2022DG Regio talk contribs 46,104 bytes +26,720 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

23 May 2022

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:1520:15, 29 November 2021DG Regio talk contribs 15,083 bytes +1,342 Created claim: summary (P836): Das Projekt Forest Ride plant den Bau einer neuen Fahrrad-Fußgängerinfrastruktur Zaprešić – Pojatno und Industriestraßen und verbindet sie mit dem bestehenden Fahrrad-Fußgängerweg, der zum Bahnhof Novi Dvor führt, um die bestehende Radwandlungsinfrastruktur zu erweitern und so die Voraussetzungen für eine bessere Entwicklung des intermodalen Verkehrs zu schaffen und die Zahl der Nutzer öffentlicher Verkehrsmittel durch den Ausbau der Fußgängerin...
  • curprev 20:1520:15, 29 November 2021DG Regio talk contribs 13,741 bytes +67 Changed label, description and/or aliases in de: translated_label
  • curprev 10:2710:27, 29 November 2021DG Regio talk contribs 13,674 bytes +1,355 Created claim: summary (P836): Le projet Forest Ride prévoit de construire une nouvelle infrastructure cyclable pour piétons Zaprešić — Pojatno et les rues industrielles et de les relier à la piste cyclable existante menant à la gare de Novi Dvor afin d’élargir l’infrastructure existante de marche cyclable, créant ainsi les conditions d’un meilleur développement du transport intermodal et d’augmenter le nombre d’usagers des transports publics grâce à l’extension des infrastru...

26 November 2021

21 June 2021

3 June 2021

  • curprev 13:2113:21, 3 June 2021DG Regio talk contribs 11,813 bytes +70 Changed label, description and/or aliases in en: translated_label
  • curprev 13:2113:21, 3 June 2021DG Regio talk contribs 11,743 bytes +1,324 Created claim: summary (P836): The Forest ride project is planned to build a new bicycle pedestrian infrastructure with Zaprešić — a Strip up to the industrial street, and to connect them to a existing ‘cycling footpath’ at the ‘New Castle’ railway station and to expand the existing bicycle co-pedestrian infrastructure, thus paving the way for the better development of intermodal transport and increasing the number of users of public transport by building on the public transp...

2 June 2021