Revision history of "Construction of a bridge mainland — Chyzh Island on connecting roads — 2nd design phase" (Q2734680)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 August 2024

23 March 2024

11 June 2023

1 June 2023

12 October 2022

11 July 2022

  • curprev 03:5303:53, 11 July 2022DG Regio talk contribs 57,072 bytes +34,353 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:1520:15, 29 November 2021DG Regio talk contribs 16,938 bytes +1,791 Created claim: summary (P836): Ziel des Projekts ist der Bau der Brücke auf dem Festland von Ciovo mit Zufahrtsstraßen. Der Bau von Brücken und Verbindungsstraßen wird zu einer Beschleunigung der Verkehrsströme, zur Verringerung der Verkehrsüberlastung und zur Beseitigung von Engpässen, zur Verringerung schädlicher Emissionen und zur Steigerung der Attraktivität der Region im Tourismus führen. Die geplante Projektlaufzeit beträgt 58 Monate und wird im Zeitraum vom 1.3.2015 bi...
  • curprev 20:1520:15, 29 November 2021DG Regio talk contribs 15,147 bytes +149 Changed label, description and/or aliases in de: translated_label
  • curprev 10:2910:29, 29 November 2021DG Regio talk contribs 14,998 bytes +1,793 Created claim: summary (P836): L’objectif du projet est la construction du pont du continent-île de Ciovo avec des routes d’accès. La construction de ponts et de routes de raccordement permettra d’accélérer les flux de trafic, de réduire la congestion et de supprimer les goulets d’étranglement, de réduire les émissions nocives et d’accroître l’attrait touristique de la région. La durée prévue du projet est de 58 mois et sera mise en œuvre au cours de la période allant du 1.3....

26 November 2021

21 June 2021

3 June 2021

  • curprev 13:2013:20, 3 June 2021DG Regio talk contribs 12,607 bytes +150 Changed label, description and/or aliases in en: translated_label
  • curprev 13:2013:20, 3 June 2021DG Regio talk contribs 12,457 bytes +1,650 Created claim: summary (P836): The aim of the project is to build a bridge between the Ascension Island and the accession roads. The construction of bridge and connecting roads will lead to speeding up traffic flows, reducing congestion and removing the bottleneck, reducing harmful emissions, and increasing the attractiveness of the tourism region. The planned duration of the project is 58 months and will be implemented in 1.3.2015-31.12.2019. The total value of the project w...

2 June 2021