Revision history of "Construction of a bypass town of Vodice — 2nd phase" (Q2734677)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 08:2808:28, 9 October 2024DG Regio talk contribs 43,990 bytes +5 Changed label, description and/or aliases in pt
  • curprev 08:2808:28, 9 October 2024DG Regio talk contribs 43,985 bytes +3 Set a claim value: summary (P836): O projeto melhorará a disponibilidade regional da ilha de Fević, reduzirá os tempos de viagem e aumentará a segurança do tráfego para o trânsito e o tráfego local. O projeto «Construir um anel da cidade de Vodice», que tem uma extensão total de 5,14 km, está dividido em duas fases financiadas através de dois programas operacionais.

12 August 2024

20 March 2024

11 June 2023

1 June 2023

12 October 2022

11 July 2022

  • curprev 03:5303:53, 11 July 2022DG Regio talk contribs 42,606 bytes +24,036 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:1520:15, 29 November 2021DG Regio talk contribs 14,601 bytes +1,205 Created claim: summary (P836): Das Projekt wird die regionale Zugänglichkeit von Vodice und die Zugänglichkeit der Insel Prvić verbessern, die Reisezeit verkürzen und die Verkehrssicherheit für den Transit und den lokalen Verkehr erhöhen. Das Projekt „Building the Vodice Bypass“ mit einer Gesamtlänge von 5,14 km ist in zwei Phasen unterteilt, die über zwei operationelle Programme finanziert werden., translated_summary
  • curprev 20:1520:15, 29 November 2021DG Regio talk contribs 13,396 bytes +114 Changed label, description and/or aliases in de: translated_label
  • curprev 10:2910:29, 29 November 2021DG Regio talk contribs 13,282 bytes +1,220 Created claim: summary (P836): Le projet améliorera l’accessibilité régionale de Vodice et l’accessibilité de l’île de Prvić, ce qui permettra de raccourcir le temps de trajet et d’améliorer la sécurité routière pour le transit et le trafic local. Le projet «Construire le contournement de Vodice», d’une longueur totale de 5,14 km, est divisé en deux phases financées par deux programmes opérationnels., translated_summary

26 November 2021

21 June 2021

3 June 2021

  • curprev 13:2013:20, 3 June 2021DG Regio talk contribs 11,504 bytes +112 Changed label, description and/or aliases in en: translated_label
  • curprev 13:2013:20, 3 June 2021DG Regio talk contribs 11,392 bytes +1,140 Created claim: summary (P836): The project will improve the regional availability of the Fević island, shorten journey times and increase traffic safety for transit and local traffic. The project “Building a ring of the city of Vodice”, which has a total length of 5.14 km, is divided into two phases funded through two operational programmes., translated_summary

2 June 2021