Revision history of "Sewage system and waste water treatment from the agglomeration of the Guide to the Tribunale di FAZA — FAZA 2" (Q2734618)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 08:1708:17, 10 October 2024DG Regio talk contribs 46,047 bytes +1 Changed label, description and/or aliases in pt
  • curprev 08:1708:17, 10 October 2024DG Regio talk contribs 46,046 bytes −2 Set a claim value: summary (P836): O objectivo essencial é proteger um estado de saúde saudável e melhorar as condições de vida dos habitantes. O objetivo será alcançado através da construção de uma rede de esgotos com instalações associadas, construção de um novo código UPOV II, purificação e reconstrução do sistema de abastecimento de água. O projeto está dividido em duas fases, através de dois programas operacionais.

12 August 2024

22 March 2024

19 June 2023

11 June 2023

1 June 2023

12 October 2022

11 July 2022

  • curprev 03:5103:51, 11 July 2022DG Regio talk contribs 44,640 bytes +25,697 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:1420:14, 29 November 2021DG Regio talk contribs 14,834 bytes +1,182 Created claim: summary (P836): Hauptziel ist es, die Gesundheitssituation zu schützen und die Lebensbedingungen der Bewohner zu verbessern. Das Ziel wird erreicht durch den Bau eines Abwassernetzes mit zugehörigen Anlagen, den Bau der neuen UPOV II-st. Reinigung und Rekonstruktion des Wasserversorgungssystems. Das Projekt ist in zwei Phasen durch zwei operationelle Programme unterteilt., translated_summary
  • curprev 20:1420:14, 29 November 2021DG Regio talk contribs 13,652 bytes +150 Changed label, description and/or aliases in de: translated_label
  • curprev 10:2910:29, 29 November 2021DG Regio talk contribs 13,502 bytes +1,243 Created claim: summary (P836): L’objectif principal est de protéger la situation sanitaire et d’améliorer les conditions de vie des résidents. L’objectif sera atteint par la construction d’un réseau d’égouts avec les installations associées, la construction du nouveau UPOV II-st. purification et la reconstruction du système d’approvisionnement en eau. Le projet est divisé en deux phases à travers deux programmes opérationnels., translated_summary

26 November 2021

21 June 2021

3 June 2021

  • curprev 13:2013:20, 3 June 2021DG Regio talk contribs 11,661 bytes +171 Changed label, description and/or aliases in en: translated_label
  • curprev 13:2013:20, 3 June 2021DG Regio talk contribs 11,490 bytes +1,197 Created claim: summary (P836): The essential aim is to protect a healthy state of health and to improve living conditions for inhabitants. The objective will be achieved through the construction of a sewage network with associated facilities, building a new UPOV II code, purification and reconstruction of the water supply system. The project is broken down into 2 phases through 2 operational programmes., translated_summary

2 June 2021