Revision history of "Improvement of Vukovar Water Infrastructure — Phase II" (Q2734615)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 August 2024

7 March 2024

19 June 2023

11 June 2023

1 June 2023

12 October 2022

11 July 2022

  • curprev 03:5103:51, 11 July 2022DG Regio talk contribs 49,491 bytes +28,856 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 20:1420:14, 29 November 2021DG Regio talk contribs 15,740 bytes +1,494 Created claim: summary (P836): Das Projekt umfasst Investitionen in Wasserversorgungs- und Abwasserentsorgungs- und Abwasserbehandlungssysteme, um die Anforderungen der EU-Richtlinien zu erfüllen. Zielgruppe sind die an das bestehende Entwässerungssystem angeschlossenen Einwohner und diejenigen, die an das Entwässerungssystem und die neue UPOV angeschlossen werden, sowie alle Anwohner, die nach der Umsetzung an die Wasserversorgung angeschlossen sind. Die Durchführung des Pro...
  • curprev 20:1420:14, 29 November 2021DG Regio talk contribs 14,246 bytes +137 Changed label, description and/or aliases in de: translated_label
  • curprev 10:2910:29, 29 November 2021DG Regio talk contribs 14,109 bytes +1,518 Created claim: summary (P836): Le projet prévoit des investissements dans les systèmes d’approvisionnement en eau, d’assainissement et de traitement des eaux usées afin de satisfaire aux exigences des directives de l’UE. Le groupe cible est les habitants connectés au système de drainage existant et ceux qui seront connectés au système de drainage et au nouveau UPOV et tous les résidents connectés à l’approvisionnement en eau après la mise en œuvre. La mise en œuvre du projet...

26 November 2021

21 June 2021

8 June 2021

3 June 2021

  • curprev 13:2013:20, 3 June 2021DG Regio talk contribs 11,586 bytes +115 Changed label, description and/or aliases in en: translated_label
  • curprev 13:2013:20, 3 June 2021DG Regio talk contribs 11,471 bytes +1,389 Created claim: summary (P836): The project covers investments in water and waste water supply and treatment systems to achieve the requirements of the EU Directives. The target group includes residents connected to the existing drainage system and those who will be connected after implementation, as well as a new UPOV and all inhabitants connected to a water supply. The implementation of the project is divided into two phases through two Operational Programmes (OPJO and OPCC)...

2 June 2021