Revision history of "Energy renovation of the Primary School, Vladimir Nazora Škbrat" (Q2733185)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 August 2024

20 March 2024

11 June 2023

1 June 2023

12 October 2022

11 July 2022

  • curprev 03:1403:14, 11 July 2022DG Regio talk contribs 50,934 bytes +30,038 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 19:5819:58, 29 November 2021DG Regio talk contribs 15,917 bytes +1,508 Created claim: summary (P836): Durchführungsmaßnahmen zur Energieeffizienz (Kombination von fünf Bauten, eine elektrische und eine mechanische Maßnahme) beziehen sich auf die Grundschule Vladimir Nazor in Škabrnja:- Installation der Wärmedämmung der Außenwände und des Bodens in Richtung Außenraum- Installation der Wärmedämmung der Decke in Richtung Dachboden – Installation der thermischen und Abdichtung von Dächern über beheizt- Ersatz der Außentischlerei- Modernisierung der...
  • curprev 19:5819:58, 29 November 2021DG Regio talk contribs 14,409 bytes +118 Changed label, description and/or aliases in de: translated_label
  • curprev 10:1510:15, 29 November 2021DG Regio talk contribs 14,291 bytes +1,579 Created claim: summary (P836): Les mesures de mise en œuvre de l’efficacité énergétique (combinaison de cinq constructions, d’une mesure électrique et d’une mesure mécanique) se réfèrent à l’école élémentaire Vladimir Nazor à Škabrnja:- installation d’isolation thermique des murs extérieurs et du sol vers l’espace extérieur- installation d’isolation thermique du plafond vers le grenier — installation thermique et étanchéité des toits au-dessus du chauffage- remplacement de la...

26 November 2021

21 June 2021

3 June 2021

  • curprev 12:5612:56, 3 June 2021DG Regio talk contribs 12,149 bytes +1,468 Created claim: summary (P836): Energy efficiency implementing measures (a combination of five construction, one electro-technical and one mechanical means of machinery) refer to the Principal School, Vladimir Nazora,: integration of the thermal insulation of external walls and the floor towards the outer space — installation of thermal insulation ceilings in the attic — modernisation of the external trim and installation of thermal and hydroinsulation of indoor lighting — mod...
  • curprev 12:5612:56, 3 June 2021DG Regio talk contribs 10,681 bytes −1,468 Removed claim: summary (P836): Energy efficiency implementing measures (a combination of five construction, one electro-technical and one mechanical means of machinery) refer to the Principal School, Vladimir Nazora,: integration of the thermal insulation of external walls and the floor towards the outer space — installation of thermal insulation ceilings in the attic — modernisation of the external trim and installation of thermal and hydroinsulation of indoor lighting — m...
  • curprev 12:5412:54, 3 June 2021DG Regio talk contribs 12,149 bytes +123 Changed label, description and/or aliases in en: translated_label
  • curprev 12:5412:54, 3 June 2021DG Regio talk contribs 12,026 bytes +1,468 Created claim: summary (P836): Energy efficiency implementing measures (a combination of five construction, one electro-technical and one mechanical means of machinery) refer to the Principal School, Vladimir Nazora,: integration of the thermal insulation of external walls and the floor towards the outer space — installation of thermal insulation ceilings in the attic — modernisation of the external trim and installation of thermal and hydroinsulation of indoor lighting — mod...

2 June 2021