Revision history of "Energy renovation of the Urban Regional Schools of Miklouš, Miklousš 61, Miklousš, primary schools" (Q2733145)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 21:0721:07, 9 October 2024DG Regio talk contribs 45,936 bytes +16 Set a claim value: summary (P836): O projeto prevê uma poupança de 52,66 % por ano de energia necessária para o aquecimento, a alcançar com: a) Resolução do telhado, b) Isolamento da parede exterior da área aquecida com o sistema, c) O projeto destina-se a remover as camadas de piso existentes e o isolamento do piso do piso, d) substituição da marcenaria de madeira da nova marcenaria de PVC e) sistema de aquecimento de substituição f)

12 August 2024

20 March 2024

11 June 2023

1 June 2023

12 October 2022

11 July 2022

  • curprev 03:1303:13, 11 July 2022DG Regio talk contribs 45,770 bytes +26,166 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 19:5819:58, 29 November 2021DG Regio talk contribs 15,122 bytes +1,261 Created claim: summary (P836): Das Projekt sieht eine Einsparung von 52,66 % der für Heizung benötigten jährlichen Energie vor, die erreicht wird durch: a) Dachreparatur, b) Isolierung der Außenwand des beheizten Raumes durch Fassadensystem, c) Das Projekt sieht die Entfernung der vorhandenen Bodenschichten und die Installation der Wärmedämmung des Bodens, d) Ersatz der Holztischlerie durch neue PVC-Schirmerei e) Ersatz der Heizungsanlage f) Blitzdämmung vor, translated_summary
  • curprev 19:5819:58, 29 November 2021DG Regio talk contribs 13,861 bytes +161 Changed label, description and/or aliases in de: translated_label
  • curprev 10:1410:14, 29 November 2021DG Regio talk contribs 13,700 bytes +1,329 Created claim: summary (P836): Le projet prévoit une économie de 52,66 % de l’énergie annuelle nécessaire pour le chauffage, ce qui est réalisé par: a) Réparation du toit, b) isolation du mur extérieur de l’espace chauffé par le système de façade, c) Le projet prévoit l’enlèvement des couches de sol existantes et l’installation d’isolation thermique du plancher, d) le remplacement de la menuiserie en bois par une nouvelle menuiserie PVC e) le remplacement du système de chauff...

26 November 2021

21 June 2021

3 June 2021

  • curprev 12:5512:55, 3 June 2021DG Regio talk contribs 11,748 bytes +1,204 Created claim: summary (P836): The project provides for savings of 52.66 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof, b) Insulation of the outer wall of the heated area with the system, c) The design is intended to remove existing floor layers and floor insulation of the floor, d) replacement of wooden joinery of the new PVC joinery (e) replacement heating system f), translated_summary
  • curprev 12:5512:55, 3 June 2021DG Regio talk contribs 10,544 bytes −1,204 Removed claim: summary (P836): The project provides for savings of 52.66 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof, b) Insulation of the outer wall of the heated area with the system, c) The design is intended to remove existing floor layers and floor insulation of the floor, d) replacement of wooden joinery of the new PVC joinery (e) replacement heating system f), remove_old_english_translation
  • curprev 12:5412:54, 3 June 2021DG Regio talk contribs 11,748 bytes +161 Changed label, description and/or aliases in en: translated_label
  • curprev 12:5412:54, 3 June 2021DG Regio talk contribs 11,587 bytes +1,204 Created claim: summary (P836): The project provides for savings of 52.66 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof, b) Insulation of the outer wall of the heated area with the system, c) The design is intended to remove existing floor layers and floor insulation of the floor, d) replacement of wooden joinery of the new PVC joinery (e) replacement heating system f), translated_summary

2 June 2021