Revision history of "Energy renovation of the Suhopol-Primary School building and school hall at Kraja Tomislav 26, Suhopolje" (Q2733092)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

11 June 2023

1 June 2023

12 October 2022

26 September 2022

11 July 2022

  • curprev 03:1103:11, 11 July 2022DG Regio talk contribs 48,561 bytes +28,334 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

23 May 2022

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 19:5319:53, 29 November 2021DG Regio talk contribs 15,521 bytes +1,338 Created claim: summary (P836): Das Projekt sieht die Rekonstruktion der Gebäudehülle vor, die vier Baumaßnahmen umfasst (Wärmedämmung von Außenwänden, Wärmedämmung der Decke in Richtung des unbeheizten Dachbodens und Isolierung eines Teils des Fundaments und Safts, Isolierung des geneigten Daches über dem beheizten Teil) und zwei mechanische Maßnahmen (Installation eines hocheffizienten Gaskondensators und Einbau einer Wärmepumpe zur Vorbereitung von PTV), um den Energieverbr...
  • curprev 19:5319:53, 29 November 2021DG Regio talk contribs 14,183 bytes +183 Changed label, description and/or aliases in de: translated_label
  • curprev 10:1310:13, 29 November 2021DG Regio talk contribs 14,000 bytes +1,411 Created claim: summary (P836): Le projet prévoit la reconstruction de l’enveloppe du bâtiment, qui comprend quatre mesures de construction (isolation thermique des murs extérieurs, isolation thermique du plafond vers le grenier non chauffé et isolation d’une partie de la fondation et du jus, isolation du toit incliné au-dessus de la partie chauffée) et deux mesures mécaniques (Installation d’une chaudière à condensation de gaz à haut rendement et installation d’une pompe à ch...

26 November 2021

21 June 2021

3 June 2021

  • curprev 12:5512:55, 3 June 2021DG Regio talk contribs 11,952 bytes +1,331 Created claim: summary (P836): The project provides for the renovation of the building envelope comprising four structural measures (thermal insulation of external walls, thermal insulation of the ceiling to an unheated attic, insulation of part of the foundations, insulation of the part of the roof above the heated part), and two engine mechanical measures (construction of a high efficient gas condensing boiler and the installation of heat pumps for DHW generation), all with...
  • curprev 12:5512:55, 3 June 2021DG Regio talk contribs 10,621 bytes −1,331 Removed claim: summary (P836): The project provides for the renovation of the building envelope comprising four structural measures (thermal insulation of external walls, thermal insulation of the ceiling to an unheated attic, insulation of part of the foundations, insulation of the part of the roof above the heated part), and two engine mechanical measures (construction of a high efficient gas condensing boiler and the installation of heat pumps for DHW generation), all wi...
  • curprev 12:5312:53, 3 June 2021DG Regio talk contribs 11,952 bytes +164 Changed label, description and/or aliases in en: translated_label
  • curprev 12:5312:53, 3 June 2021DG Regio talk contribs 11,788 bytes +1,331 Created claim: summary (P836): The project provides for the renovation of the building envelope comprising four structural measures (thermal insulation of external walls, thermal insulation of the ceiling to an unheated attic, insulation of part of the foundations, insulation of the part of the roof above the heated part), and two engine mechanical measures (construction of a high efficient gas condensing boiler and the installation of heat pumps for DHW generation), all with...

2 June 2021