Revision history of "Energy renovation of the primary school “Petra Preradović Pitasča’s primary school at Trg King Tomislav 9, Pitomaca" (Q2733046)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 August 2024

20 March 2024

14 November 2023

11 June 2023

1 June 2023

12 October 2022

26 September 2022

11 July 2022

  • curprev 03:1003:10, 11 July 2022DG Regio talk contribs 49,270 bytes +29,045 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

23 May 2022

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 19:4919:49, 29 November 2021DG Regio talk contribs 15,544 bytes +1,358 Created claim: summary (P836): Das Projekt plante eine energetische Sanierung, die vier Baumaßnahmen umfasst (Zusatz, Renovierung und Austausch von Teilen der Hülle des beheizten Teils des Gebäudes, Wärmedämmung von Böden und Decken im Inneren des Gebäudes und Austausch von Außentischlereien sowie den Bau einer Rampe für Menschen mit Mobilitätsschwierigkeiten) und eine elektrische Maßnahme (Ersetzung des bestehenden Beleuchtungssystems durch energieeffiziente LED-Beleuchtung)...
  • curprev 19:4919:49, 29 November 2021DG Regio talk contribs 14,186 bytes +160 Changed label, description and/or aliases in de: translated_label
  • curprev 10:1310:13, 29 November 2021DG Regio talk contribs 14,026 bytes +1,435 Created claim: summary (P836): Le projet prévoyait la rénovation énergétique qui comprend quatre mesures de construction (ajout, rénovation et remplacement de parties de l’enveloppe de la partie chauffée du bâtiment, isolation thermique des planchers et plafonds à l’intérieur du bâtiment et remplacement de la menuiserie extérieure, ainsi que la construction d’une rampe pour les personnes ayant des difficultés de mobilité) et une mesure électrique (remplacement du système d’éc...

26 November 2021

21 June 2021

3 June 2021

  • curprev 12:5212:52, 3 June 2021DG Regio talk contribs 11,986 bytes +181 Changed label, description and/or aliases in en: translated_label
  • curprev 12:5212:52, 3 June 2021DG Regio talk contribs 11,805 bytes +1,346 Created claim: summary (P836): The project is planned for energy renovation involving four construction measures (addition, renewal and replacement of the parts of the cover part of the heating part of the building, thermal insulation of floors and ceilings inside the building and replacement of external joinery, and construction of ramps for persons with mobility difficulties) and 1 electrotechnical measure (replacing the existing lighting system with energy-efficient LED li...

2 June 2021