Revision history of "The energy renovation of the City of Slatina district building at Trg sv. Josipa 10, Slatina" (Q2733008)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 August 2024

23 March 2024

14 November 2023

11 June 2023

1 June 2023

12 October 2022

26 September 2022

11 July 2022

  • curprev 03:0903:09, 11 July 2022DG Regio talk contribs 50,257 bytes +29,319 Changed label, description and/or aliases in da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, hr, nl, fr, de, it, es, and other parts: Adding translations: da, el, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

23 May 2022

13 January 2022

11 January 2022

4 December 2021

29 November 2021

  • curprev 19:4619:46, 29 November 2021DG Regio talk contribs 15,894 bytes +1,486 Created claim: summary (P836): Das Projekt plant eine energetische Sanierung mit neun Baumaßnahmen (thermische Isolierung von Außenwänden, Wänden zum Boden, Wände bis zum unbeheizten Dachboden, Decke bis unbeheiztes Dachboden, abfallendes Dach über beheiztem Raum (Eingang zum unausgekleideten Dachboden), Decke über beheiztem Raum (Decken in Richtung Terrasse), Decken an Außenluft, Boden zur Außenluft, Ersatz der Außentischlerei) und drei mechanische Maßnahmen (Rekonstruktion...
  • curprev 19:4619:46, 29 November 2021DG Regio talk contribs 14,408 bytes +150 Changed label, description and/or aliases in de: translated_label
  • curprev 10:1210:12, 29 November 2021DG Regio talk contribs 14,258 bytes +1,547 Created claim: summary (P836): Le projet prévoit une rénovation énergétique comprenant neuf mesures de construction (isolation thermique des murs extérieurs, murs au sol, murs au grenier non chauffé, plafond au grenier non chauffé, toit incliné sur l’espace chauffé (entrée au grenier non couvert), plafond au-dessus de l’espace chauffé (plafond vers la terrasse), plafonds à l’air extérieur, sol à air extérieur, remplacement de la menuiserie extérieure) et trois mesures mécaniq...

26 November 2021

21 June 2021

3 June 2021

  • curprev 12:5212:52, 3 June 2021DG Regio talk contribs 12,115 bytes +151 Changed label, description and/or aliases in en: translated_label
  • curprev 12:5212:52, 3 June 2021DG Regio talk contribs 11,964 bytes +1,372 Created claim: summary (P836): The project is planned with energy renovations comprising nine building measures (thermal insulation of external walls, ground wall, walls bordering the unheated roof, the ceiling on unheated roof, the sloping roof over the heated space (entrance into unregulated subroof), ceilings over the heated space (ceiling towards terrace), external air ceilings, floor towards external air, the external trim exchange, the exchange of exterior trim, and ins...

2 June 2021