Revision history of "Sanitary and crowded sewerage in Kędzierzyn" (Q2718758)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 07:1707:17, 11 October 2024DG Regio talk contribs 83,134 bytes +24 Changed label, description and/or aliases in pt
  • curprev 07:1707:17, 11 October 2024DG Regio talk contribs 83,110 bytes −29 Set a claim value: summary (P836): O projeto é um projeto fixo e consistirá na execução da segunda fase do projeto destinado a sistematizar a gestão das águas residuais do município de Sianów. Nesta fase, prevê-se que a cidade de Kędzierzyn seja canalizada ao longo do percurso do coletor de águas residuais comprimidas (que conduz à estação de tratamento de águas residuais de Jamno, pertencente à MWiK Koszalin). Atualmente, o coletor recolhe as águas residuais da estação central de bo...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 21:4621:46, 2 March 2023DG Regio talk contribs 79,601 bytes −429 Changed label, description and/or aliases in da, it, sk, lv, fi, cs, hr, pt, ga, sv, et, de, hu, bg, ro, es, nl, el, lt, fr, mt, sl, and other parts

21 October 2022

10 July 2022

  • curprev 21:4521:45, 10 July 2022DG Regio talk contribs 79,204 bytes +51,149 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 02:2402:24, 8 July 2021DG Regio talk contribs 13,338 bytes +103 Changed label, description and/or aliases in en: translated_label
  • curprev 02:2402:24, 8 July 2021DG Regio talk contribs 13,235 bytes +2,641 Created claim: summary (P836): The project is a stationary project and will consist of the implementation of the second stage of the project aimed at systematising the waste water management of the municipality of Sianów. At this stage, the town of Kędzierzyn is planned to be sewered along the route of the compressed sewage collector (which leads to the sewage treatment plant in Jamno, belonging to MWiK Koszalin). Currently, the collector collects waste water from the central...

22 May 2021

21 May 2021