Revision history of "Increasing the potential of the energy grid ENEA Operator Sp. z o.o. in order to receive energy from renewable sources in the Zachodniopomorskie Voivodeship" (Q2718707)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 07:1707:17, 11 October 2024DG Regio talk contribs 92,022 bytes +12 Changed label, description and/or aliases in pt
  • curprev 07:1707:17, 11 October 2024DG Regio talk contribs 92,010 bytes +93 Set a claim value: summary (P836): O âmbito do projeto inclui a reconstrução da central elétrica WN/SN Pyrzyce. A estação está localizada numa zona com procura identificada de novas capacidades de ligação relacionadas com a produção de FER – a identificação da procura foi feita na fase de elaboração do plano de gestão de baixas emissões para o município de Pyrzyce para os anos 2015-2020. O projeto é executado segundo a fórmula «conceção e construção», segundo a qual o contratante sel...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:1122:11, 2 March 2023DG Regio talk contribs 88,378 bytes −2,203 Changed label, description and/or aliases in it, da, sk, cs, lv, hr, es, fi, fr, ro, pt, ga, el, et, lt, sl, sv, bg, de, hu, mt, nl, and other parts

21 October 2022

28 July 2022

  • curprev 04:0604:06, 28 July 2022DG Regio talk contribs 89,759 bytes +58,700 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 02:2302:23, 8 July 2021DG Regio talk contribs 14,162 bytes +216 Changed label, description and/or aliases in en: translated_label
  • curprev 02:2302:23, 8 July 2021DG Regio talk contribs 13,946 bytes +2,942 Created claim: summary (P836): The scope of the project includes the reconstruction of the WN/SN Pyrzyce power station. The station is located in an area with identified demand for new connection capacities in connection with RES production – the identification of the demand was made at the stage of drawing up the Low Emission Management Plan for the Municipality of Pyrzyce for the years 2015-2020. The project is implemented in the formula “design and build” according to whic...

22 May 2021

21 May 2021