Revision history of "Construction of a photovoltaic installation with a capacity of about 1 MWp at the Regional Waste Management Plant in Słajsin on plot No 66/8 with an area of 2,8318 ha, the area of Słajsino, Nowogard." (Q2718695)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 08:2908:29, 9 October 2024DG Regio talk contribs 73,265 bytes 0 Changed label, description and/or aliases in pt
  • curprev 08:2908:29, 9 October 2024DG Regio talk contribs 73,265 bytes +25 Set a claim value: summary (P836): O projecto é estacionário. A execução do projeto situar-se-á em Słajsino, na parcela n.o 66/8, com uma superfície de 2 818 ha, na zona de Słajsino, Nowogard. A implementação do projeto consistirá na construção de uma instalação fotovoltaica com uma capacidade de cerca de 1 MWp na Central Regional de Gestão de Resíduos. A fim de executar corretamente o projeto, na fase de candidatura e durante a execução, foi criado um grupo de trabalho para o projet...

23 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:3520:35, 2 March 2023DG Regio talk contribs 69,701 bytes +35 Changed label, description and/or aliases in da, lv, it, sk, cs, el, hu, ga, fr, et, lt, ro, hr, nl, sv, pt, sl, de, mt, fi, es, bg, and other parts

21 October 2022

10 July 2022

  • curprev 21:4421:44, 10 July 2022DG Regio talk contribs 68,842 bytes +43,443 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 02:2302:23, 8 July 2021DG Regio talk contribs 12,571 bytes +261 Changed label, description and/or aliases in en: translated_label
  • curprev 02:2302:23, 8 July 2021DG Regio talk contribs 12,310 bytes +2,131 Created claim: summary (P836): The project is stationary. The implementation of the project will be located in Słajsino on plot No 66/8 with an area of 2,8318 ha, the area of Słajsino, Nowogard. The implementation of the project will consist of the construction of a photovoltaic installation with a capacity of about 1 MWp at the Regional Waste Management Plant. In order to implement the project correctly, at the application stage and during implementation, a task force for th...

22 May 2021

21 May 2021