Revision history of "Construction of a photovoltaic installation on facilities belonging to RWiK Białogard in the city and municipality of Białogard, the city of Karlino, Połczyn Zdrój, Bobolice" (Q2718691)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

14 October 2024

  • curprev 09:0909:09, 14 October 2024DG Regio talk contribs 96,810 bytes +8 Changed label, description and/or aliases in pt
  • curprev 09:0909:09, 14 October 2024DG Regio talk contribs 96,802 bytes −65 Set a claim value: summary (P836): O projecto é estacionário. Como parte do projeto, 9 instalações fotovoltaicas serão construídas em tecnologia monocristalina de 414,48 kWp (cada uma com uma potência de 330 Wp, o número total de 1256 painéis) nas instalações da RWiK Białogard, ou seja, no edifício administrativo. RWiK em Białogard com uma potência de 31,68 kWp, OŚ em Karlin com uma capacidade de 48,84 kWp, OŚ em Bobolice com uma potência de 48,84 kWp, 2 pcs em áreas: Eixo em Białoga...

7 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 23:5223:52, 2 March 2023DG Regio talk contribs 92,237 bytes +561 Changed label, description and/or aliases in da, it, sk, ro, de, fi, cs, bg, lv, el, lt, ga, fr, es, pt, et, sl, mt, nl, hr, hu, sv, and other parts

21 October 2022

10 July 2022

  • curprev 21:4421:44, 10 July 2022DG Regio talk contribs 90,111 bytes +57,052 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 02:2302:23, 8 July 2021DG Regio talk contribs 17,735 bytes +237 Changed label, description and/or aliases in en: translated_label
  • curprev 02:2202:22, 8 July 2021DG Regio talk contribs 17,498 bytes +2,886 Created claim: summary (P836): The project is stationary. As part of the project, 9 photovoltaic installations will be built in monocrystalline technology of 414.48 kWp (each with a power of 330 Wp, the total number of 1256 panels) on RWiK Białogard facilities, i.e. on the admin building. RWiK in Białogard with a power of 31.68 kWp, OŚ in Karlin with a capacity of 48.84 kWp, OŚ in Bobolice with a power of 48.84 kWp, 2 pcs. in areas: Axle in Białogard (total power 97.68 kWp),...

22 May 2021

21 May 2021