Revision history of "Extension of the municipal water supply network in Linowo area – 1st stage from junction No 219 to 301/118; Second stage from no. 301/118 to 179/71" (Q2717371)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 07:2107:21, 11 October 2024DG Regio talk contribs 85,460 bytes −4 Changed label, description and/or aliases in pt
  • curprev 07:2107:21, 11 October 2024DG Regio talk contribs 85,464 bytes +28 Set a claim value: summary (P836): O projeto é uma unidade de análise autónoma e abrange todas as tarefas necessárias para assegurar a funcionalidade e operacionalidade da infraestrutura assim que o âmbito material estiver concluído. Não são necessárias outras tarefas para lançar os produtos do projeto. 1. Localização a) Expansão da rede municipal de abastecimento de água em Linowo – 1.a fase: inclui a construção de uma rede de abastecimento de água através da instalação de condutas...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 21:4221:42, 2 March 2023DG Regio talk contribs 81,119 bytes −405 Changed label, description and/or aliases in it, sk, da, fi, sv, ga, fr, el, lv, hu, cs, pt, es, hr, sl, et, bg, ro, de, lt, nl, mt, and other parts

25 October 2022

22 October 2022

28 July 2022

  • curprev 03:5203:52, 28 July 2022DG Regio talk contribs 79,836 bytes +51,383 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 01:5601:56, 8 July 2021DG Regio talk contribs 13,354 bytes +209 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5601:56, 8 July 2021DG Regio talk contribs 13,145 bytes +2,573 Created claim: summary (P836): The project is a stand-alone unit of analysis and covers all tasks necessary to ensure the functionality and operability of the infrastructure as soon as the material scope is completed. Other tasks are not required to launch project products. 1. Location a) Expansion of the municipal water supply network in Linowo – 1st stage: it includes the construction of a water supply network by installing pipelines from PE SDR17 PN10 pipes with an externa...

22 May 2021

21 May 2021