Revision history of "Extension, reconstruction and renovation and thermomodernisation of the Aleksandr Sewruk Theatre in Elbląg" (Q2717326)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 18:5918:59, 7 October 2024DG Regio talk contribs 91,086 bytes −94 Set a claim value: summary (P836): Este projeto consiste na termomodernização do edifício de utilidade pública do Teatro Aleksandr Sewruk em Elbląg, ul. Theatrical 11, juntamente com a instalação de fontes de energia renováveis e prevê: — insulation of the external walls No. 1 of the building with styrofoam board of at least 10 cm, – warming of the external walls No. 2 of the building with styrofoam board of at least 15 cm, – warming of the building with a polystyrene board of at lea...

22 March 2024

15 January 2024

13 December 2023

6 July 2023

9 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

10 July 2022

  • curprev 21:1521:15, 10 July 2022DG Regio talk contribs 86,660 bytes +56,222 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 01:5501:55, 8 July 2021DG Regio talk contribs 13,882 bytes +167 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5501:55, 8 July 2021DG Regio talk contribs 13,715 bytes +2,852 Created claim: summary (P836): This project consists of the thermomodernisation of the public utility building of the Aleksandr Sewruk Theatre in Elbląg, ul. Theatrical 11 together with the installation of renewable energy sources and provides for: — insulation of the external walls No. 1 of the building with styrofoam board of at least 10 cm, – warming of the external walls No. 2 of the building with styrofoam board of at least 15 cm, – warming of the building with a polysty...

22 May 2021

21 May 2021