Revision history of "Construction of Gajle III photovoltaic power plant up to 1 MW" (Q2717282)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 21:4221:42, 2 March 2023DG Regio talk contribs 87,219 bytes −666 Changed label, description and/or aliases in lv, it, sv, ro, da, fr, bg, sk, de, et, ga, cs, fi, sl, el, hu, nl, mt, hr, lt, es, pt, and other parts

21 October 2022

28 July 2022

  • curprev 03:5103:51, 28 July 2022DG Regio talk contribs 87,059 bytes +56,606 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 01:5501:55, 8 July 2021DG Regio talk contribs 13,917 bytes +120 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5501:55, 8 July 2021DG Regio talk contribs 13,797 bytes +2,910 Created claim: summary (P836): The project concerns the construction of a photovoltaic power plant with a capacity of up to 0,932 MW on plot no. 373/2, cadastral unit 280205_5 Money, area 280205_5.0001 Białczyn connected with a cable line located on plots 373/2,384,385,301 The object of the investment is the construction of a solar power plant. The power plant consists of free-standing photovoltaic panels mounted on support structures that are inserted into the ground. The pa...

22 May 2021

21 May 2021