Revision history of "Investments in renewable energy sources at ADRIATICA Mateusz Krupa" (Q2717277)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

21 October 2022

10 July 2022

  • curprev 21:1421:14, 10 July 2022DG Regio talk contribs 83,710 bytes +54,448 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 01:5501:55, 8 July 2021DG Regio talk contribs 13,612 bytes +125 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5501:55, 8 July 2021DG Regio talk contribs 13,487 bytes +2,668 Created claim: summary (P836): The investment consists of the purchase and assembly in Olecko, plot number 3264, area 0002 Olecko: — roof photovoltaic installation – 172 panels (polycrystalline, single panel power 290 W each) with a power of 49.88 kW with 2 inverters with a total power of 40 kW (unit power is 20 kW), necessary wiring and accessories, – heat pump (air-water) of 223,7 kW. PV panels use photovoltaic phenomenon to convert radiation to electr. By means of cable co...

22 May 2021

21 May 2021