Revision history of "Supplementing the energy supply system of Dwur Dębówko through investment in photovoltaic cells" (Q2717257)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 21:4221:42, 2 March 2023DG Regio talk contribs 90,024 bytes +3,121 Changed label, description and/or aliases in da, lv, sk, it, el, cs, et, sv, fi, hr, pt, fr, ga, ro, de, hu, mt, lt, bg, sl, es, nl, and other parts

21 October 2022

28 July 2022

  • curprev 03:5103:51, 28 July 2022DG Regio talk contribs 86,076 bytes +55,720 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 01:5401:54, 8 July 2021DG Regio talk contribs 13,897 bytes +156 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5401:54, 8 July 2021DG Regio talk contribs 13,741 bytes +2,827 Created claim: summary (P836): The project consists of the purchase and assembly of photovoltaic panels, the location of the investment plot 251/2 area 0014 Dębówko. The 39,325 kWp installation is designed with 121325 W modules. SMART modules are designed with power optimisers. In combination with the inverter, they allow monitoring of the operation parameters of each module, this allows you to reduce the voltage of the installation on the DC side when the inverter is switche...

22 May 2021

21 May 2021