Revision history of "Improving the energy balance of the village of Świętajno through the construction of new RES" (Q2717222)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 07:2107:21, 11 October 2024DG Regio talk contribs 93,410 bytes −23 Changed label, description and/or aliases in pt
  • curprev 07:2107:21, 11 October 2024DG Regio talk contribs 93,433 bytes −80 Set a claim value: summary (P836): O investimento consiste na aquisição e construção de três microinstalações fotovoltaicas independentes, cada uma delas ligada a um contador separado, na parcela n.o: 210/12,215/3,216/5 -obręb 0008 Colónia, g. Świętajno, po.szczycieński, Cada instalação tem o seu próprio sistema de medição e ligação separada. A razão para esta configuração do investimento é a utilização prevista da energia produzida para alimentar novos investimentos. As pequenas ins...

22 March 2024

15 January 2024

13 December 2023

9 June 2023

24 May 2023

2 March 2023

  • curprev 21:4221:42, 2 March 2023DG Regio talk contribs 90,752 bytes +2,855 Changed label, description and/or aliases in fr, lv, it, sv, da, ro, fi, de, sk, cs, hr, es, bg, mt, el, et, nl, sl, lt, hu, pt, ga, and other parts

25 October 2022

21 October 2022

10 July 2022

  • curprev 21:1321:13, 10 July 2022DG Regio talk contribs 86,209 bytes +56,037 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 01:5301:53, 8 July 2021DG Regio talk contribs 13,852 bytes +153 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5301:53, 8 July 2021DG Regio talk contribs 13,699 bytes +2,812 Created claim: summary (P836): The investment consists of the purchase and construction of three independent photovoltaic micro-installations, each installation being connected to a separate meter, on plot No: 210/12,215/3,216/5 -obręb 0008 Cologne, g. Świętajno, po.szczycieński, Each of the installation has its own measuring system and separate connection. The reason for this configuration of the investment is the planned use of the energy produced to feed new investments. S...

22 May 2021

21 May 2021