Revision history of "Use of renewable energy sources in the School Complex in Jeziorany" (Q2717216)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

28 July 2022

  • curprev 03:5003:50, 28 July 2022DG Regio talk contribs 68,711 bytes +43,692 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 01:5301:53, 8 July 2021DG Regio talk contribs 12,479 bytes +125 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5301:53, 8 July 2021DG Regio talk contribs 12,354 bytes +2,177 Created claim: summary (P836): The Municipality of Jeziorany is planning to build 4 photovoltaic installations with a total capacity of 0.16957 MW (projecting the use of 556 panels with a capacity of 305 Wp each and 8 inverters with a capacity from 20 (6 units) to 25 kW (2 pcs)) and 4 air heat pump installations with a total capacity of 0.77 MW, together with the necessary technical infrastructure, on the site of plot No. ewid. 264, 268/2, 265/2, 357/61 in Jeziorany, geograph...

22 May 2021

21 May 2021