Revision history of "Investments in RES in WARMIA – PLUS" (Q2717206)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

9 June 2023

24 May 2023

2 March 2023

  • curprev 21:4221:42, 2 March 2023DG Regio talk contribs 89,762 bytes +1,112 Changed label, description and/or aliases in lv, sk, it, da, ro, ga, fi, pt, es, et, lt, hr, fr, sv, el, nl, hu, sl, bg, cs, de, mt, and other parts

25 October 2022

21 October 2022

10 July 2022

  • curprev 21:1221:12, 10 July 2022DG Regio talk contribs 86,974 bytes +56,739 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 01:5301:53, 8 July 2021DG Regio talk contribs 13,969 bytes +96 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5301:53, 8 July 2021DG Regio talk contribs 13,873 bytes +3,020 Created claim: summary (P836): The selected option concerns the construction of photovoltaic systems with accompanying INFRASTRUCTURE FOR THE AIR TEREN 0.5 ha – INDUSTRIAL TEREN TEREN Investment address: STOJPY, GM. Godkowo, d. No. 1/19 r. 10 KARWITY. Rated power 133.80 kWp, Number of photovoltaic modules 446 Number of DC/AC inverters 4, occupied area 729.21 m². The plot shall be designed for: construction of the SN 15 kV freestanding disconnection pole construction of an und...

22 May 2021

21 May 2021