Revision history of "Construction of photovoltaic micro-installation by SKIPAL" (Q2717201)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

14 June 2023

9 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

10 July 2022

  • curprev 21:1221:12, 10 July 2022DG Regio talk contribs 83,615 bytes +54,573 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 01:5201:52, 8 July 2021DG Regio talk contribs 13,590 bytes +116 Changed label, description and/or aliases in en: translated_label
  • curprev 01:5201:52, 8 July 2021DG Regio talk contribs 13,474 bytes +2,806 Created claim: summary (P836): The project concerns the installation of photovoltaic panels in the Applicant’s existing infrastructure: Clone 74 d. No 282/1, 281 (KW OL1S/00038073/3). The designed photovoltaic installation with a total power of 40.02 kWp installed panels will be installed on the roof of the building, it is built with 116 modules with a power of 345 W. Power Optimisers Power Optimisers are DC/DC converters regulating the system voltage. The devices shall have...

22 May 2021

21 May 2021