Revision history of "Thermomodernisation of the building of the Municipality Office in Lipnik" (Q2716297)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 21:0121:01, 9 October 2024DG Regio talk contribs 80,728 bytes +1 Changed label, description and/or aliases in pt
  • curprev 21:0121:01, 9 October 2024DG Regio talk contribs 80,727 bytes −65 Set a claim value: summary (P836): O objetivo do projeto é a termomodernização do edifício do Gabinete Municipal em Lipnik. O edifício é propriedade do município de Lipnik. O âmbito dos trabalhos previstos inclui, nomeadamente: 1. Isolamento das paredes exteriores do edifício. 2. Aquecimento do edifício. 3. Substituição da marcenaria de janelas e portas em todo o edifício. 4. Modernização da iluminação. 5. Instalação de painéis fotovoltaicos. O projeto alcançará os seguintes indicado...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

19 October 2022

10 July 2022

  • curprev 20:5320:53, 10 July 2022DG Regio talk contribs 75,340 bytes +48,399 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

22 September 2021

26 July 2021

8 July 2021

  • curprev 00:5500:55, 8 July 2021DG Regio talk contribs 12,983 bytes +131 Changed label, description and/or aliases in en: translated_label
  • curprev 00:5500:55, 8 July 2021DG Regio talk contribs 12,852 bytes +2,428 Created claim: summary (P836): The aim of the project is to thermomodernise the building of the Municipal Office in Lipnik. The building is owned by the Municipality of Lipnik. The planned scope of work includes, among others: 1. Insulation of the exterior walls in the building. 2. Warming of the edifice. 3. Replacement of window and door joinery throughout the building. 4. Modernisation of lighting. 5. Installation of photovoltaic panels. The project will achieve the followi...

22 May 2021

21 May 2021