Revision history of "Revitalisation of railway lines 140/169/179/885/138 connection: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim" (Q2713449)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 18:5218:52, 7 October 2024DG Regio talk contribs 63,840 bytes −1 Changed label, description and/or aliases in pt
  • curprev 18:5218:52, 7 October 2024DG Regio talk contribs 63,841 bytes −68 Set a claim value: summary (P836): O projeto tem por objeto a preparação da documentação de pré-conceção e conceção necessária para a execução do projeto «Regeneração das linhas ferroviárias n.o 140/169/179/885/138 da ligação: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim (em inglês). A documentação do projeto abrangerá o âmbito dos trabalhos, repartidos pelas seguintes secções: 1: LK 140 Katowice Ligota-Nędza, estação de Orzesze Jaśkowice, via n.o 1, do km 21,349 ao...

12 March 2024

15 January 2024

13 December 2023

6 July 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:3221:32, 2 March 2023DG Regio talk contribs 61,865 bytes +1,244 Changed label, description and/or aliases in it, da, lv, sk, sl, fi, et, de, ro, pt, hu, fr, lt, nl, mt, sv, el, ga, cs, hr, bg, es, and other parts

21 October 2022

27 September 2022

28 July 2022

  • curprev 03:1603:16, 28 July 2022DG Regio talk contribs 59,807 bytes +36,999 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

20 May 2022

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 23:3723:37, 7 July 2021DG Regio talk contribs 11,958 bytes +190 Changed label, description and/or aliases in en: translated_label
  • curprev 23:3723:37, 7 July 2021DG Regio talk contribs 11,768 bytes +1,843 Created claim: summary (P836): The subject of the project is the preparation of the pre-design and design documentation necessary for the implementation of the project "Regeneration of railway lines No 140/169/179/885/138 of the connection: Orzesze Jaśkowice-Tychy-Baraniec-KWK Piast-New Bieruń-Oświęcim. The project documentation will cover the scope of work broken down into the following sections: 1: LK 140 Katowice Ligota-Nędza, Orzesze Jaśkowice station, track no. 1 from km...

22 May 2021

21 May 2021