Revision history of "Reconstruction of the municipal road – ul. Insurgents in the Raciborska Kuźnia" (Q2713445)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 18:4618:46, 2 March 2023DG Regio talk contribs 58,759 bytes −126 Changed label, description and/or aliases in lv, it, da, sk, fi, et, ga, es, ro, de, hu, sv, bg, cs, pt, mt, sl, nl, lt, hr, el, fr, and other parts

25 October 2022

21 October 2022

28 July 2022

  • curprev 03:1603:16, 28 July 2022DG Regio talk contribs 57,219 bytes +35,252 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 23:3723:37, 7 July 2021DG Regio talk contribs 11,607 bytes +140 Changed label, description and/or aliases in en: translated_label
  • curprev 23:3723:37, 7 July 2021DG Regio talk contribs 11,467 bytes +1,733 Created claim: summary (P836): The scope of the works covered by this application includes the road lane of the municipal road, i.e. ul. Silesian insurgents in Kuźnia Raciborska, on the section from the intersection with ul. Slovak (district road No 3534S), to the intersection with the municipal road ul. It’s a brewery. The total length of the works is 428.0 m. The project will rebuild: — the existing road, i.e. replacing the base and pavement of the existing roadway with its...

22 May 2021

21 May 2021