Revision history of "Modernisation of the water treatment plant in Kamesznica" (Q2713392)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 22:0222:02, 8 October 2024DG Regio talk contribs 50,673 bytes −1 Changed label, description and/or aliases in pt
  • curprev 22:0222:02, 8 October 2024DG Regio talk contribs 50,674 bytes −53 Set a claim value: summary (P836): O projeto diz respeito à modernização da estação de tratamento de água situada em Kamesznica, com uma produção média diária de água visada em Qśr. = 6 l/s = 518 m3/dia. O projeto alargará a construção da estação de tratamento de água, reconstruirá o sistema de tratamento de água existente, substituindo os filtros rápidos existentes por uma nova turbidez até 15 UTN, e introduzirá um sistema inteligente de gestão do sistema de água.

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

25 October 2022

21 October 2022

10 July 2022

  • curprev 19:4719:47, 10 July 2022DG Regio talk contribs 43,723 bytes +25,629 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 23:3623:36, 7 July 2021DG Regio talk contribs 10,606 bytes +115 Changed label, description and/or aliases in en: translated_label
  • curprev 23:3623:36, 7 July 2021DG Regio talk contribs 10,491 bytes +1,223 Created claim: summary (P836): The project concerns the modernisation of the Water Treatment Station located in Kamesznica with a target average daily water production Qśr. = 6 l/s = 518 m³/day. The project will extend the water treatment plant building, reconstruct the existing water treatment system by replacing existing fast filters with new turbidity up to 15 NTU and introduce an intelligent water system management system., translated_summary

21 May 2021