Revision history of "Solar programme Ornontowice II" (Q2713141)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 19:5019:50, 10 October 2024DG Regio talk contribs 46,235 bytes −7 Changed label, description and/or aliases in pt
  • curprev 19:5019:50, 10 October 2024DG Regio talk contribs 46,242 bytes +35 Set a claim value: summary (P836): O pedido tem por objeto a conceção, os trabalhos de instalação, a entrada em funcionamento e a execução do procedimento de integração na rede do operador da rede de distribuição de microinstalações fotovoltaicas em 81 edifícios do município de Ornontowice. A execução do projeto melhorará o ambiente através da redução das emissões de CO2, NOx, SOx e poeiras para a atmosfera.

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:2121:21, 2 March 2023DG Regio talk contribs 42,668 bytes −637 Changed label, description and/or aliases in da, it, sk, lv, et, hr, cs, ro, fr, sv, hu, de, pt, lt, el, nl, ga, sl, es, mt, bg, fi, and other parts

25 October 2022

22 October 2022

10 July 2022

  • curprev 19:3919:39, 10 July 2022DG Regio talk contribs 41,631 bytes +24,169 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

16 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 23:3023:30, 7 July 2021DG Regio talk contribs 10,480 bytes +89 Changed label, description and/or aliases in en: translated_label
  • curprev 23:3023:30, 7 July 2021DG Regio talk contribs 10,391 bytes +1,231 Created claim: summary (P836): The subject of the application is the design, installation works, commissioning and implementation of the procedure for the integration into the network of the Distribution System Operator of photovoltaic micro-installations on 81 buildings in the municipality of Ornontowice. The implementation of the project will improve the environment by reducing emissions of CO2, NOx, SOx, and dust into the atmosphere., translated_summary

21 May 2021