Revision history of "Execution of photovoltaic installations on the buildings of the City Hall in Gliwice at ul. Victory and Bright" (Q2713120)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 22:0222:02, 8 October 2024DG Regio talk contribs 59,412 bytes −5 Changed label, description and/or aliases in pt
  • curprev 22:0222:02, 8 October 2024DG Regio talk contribs 59,417 bytes +22 Set a claim value: summary (P836): O âmbito do projeto inclui a construção e instalação de instalações fotovoltaicas nos edifícios da Câmara Municipal de Gliwice, localizados, respetivamente, em: 1. st. Componentes principais da instalação fotovoltaica: — Painéis fotovoltaicos com uma potência combinada de 49,5 kW, — Inversores de 20 e 30 kW, trifásicos, com um contador para a produção de energia com uma potência nominal escolhida para um determinado conjunto. 2. ul.Jasna Componentes...

20 March 2024

15 January 2024

13 December 2023

6 July 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:3021:30, 2 March 2023DG Regio talk contribs 55,860 bytes +261 Changed label, description and/or aliases in lv, ro, it, fr, da, el, fi, es, cs, et, ga, sk, lt, hu, sv, de, hr, pt, bg, nl, sl, mt, and other parts

22 October 2022

28 July 2022

  • curprev 03:1303:13, 28 July 2022DG Regio talk contribs 54,787 bytes +33,555 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

15 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 23:3023:30, 7 July 2021DG Regio talk contribs 11,428 bytes +170 Changed label, description and/or aliases in en: translated_label
  • curprev 23:3023:30, 7 July 2021DG Regio talk contribs 11,258 bytes +1,612 Created claim: summary (P836): The scope of the project includes the construction and installation of photovoltaic installations on the buildings of the City Hall in Gliwice, respectively located at: 1. st. Main components of photovoltaic installation: — Photovoltaic panels with a combined power of 49.5 kW, – Inverters 20 and 30 kW, three-phase with a meter for generating energy with a rated power chosen for a given set. 2. ul.Jasna Main components of photovoltaic installatio...

21 May 2021