Revision history of "Production of drainage pipes from PP using innovative pipe cutting process." (Q2712695)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 22:0222:02, 8 October 2024DG Regio talk contribs 57,903 bytes +12 Changed label, description and/or aliases in pt
  • curprev 22:0222:02, 8 October 2024DG Regio talk contribs 57,891 bytes −45 Set a claim value: summary (P836): A implementação do projecto envolve a implementação de uma tecnologia inovadora para a produção de tubos de drenagem da PP, que resulta da utilização de um perfurador único para ranhuragem em tubos de drenagem. Estes tubos têm a sua principal aplicação em sistemas de drenagem de água. A máquina funciona automaticamente na linha de produção. O projeto prevê a introdução de inovação de processos que consiste na sincronização adequada do corte através...

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:2921:29, 2 March 2023DG Regio talk contribs 55,176 bytes +1,323 Changed label, description and/or aliases in it, da, sk, sv, fi, el, ga, lv, cs, fr, sl, pt, hu, ro, et, nl, hr, de, lt, bg, mt, and other parts

25 October 2022

21 October 2022

28 July 2022

  • curprev 03:0803:08, 28 July 2022DG Regio talk contribs 52,185 bytes +31,650 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, pl, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

19 January 2022

15 January 2022

18 December 2021

15 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 23:1423:14, 7 July 2021DG Regio talk contribs 11,279 bytes +134 Changed label, description and/or aliases in en: translated_label
  • curprev 23:1423:14, 7 July 2021DG Regio talk contribs 11,145 bytes +1,539 Created claim: summary (P836): The implementation of the project involves the implementation of an innovative technology for the production of drainage pipes from PP, which results from the use of a unique perforator for grooving in drainage pipes. Such pipes have their main application in water drainage systems. The machine works automatically in the production line. The project foresees the introduction of process innovation consisting of appropriate synchronisation of cutt...

21 May 2021