Revision history of "Armament of areas at ul. Metallic in Chorzów" (Q2712690)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 18:5218:52, 7 October 2024DG Regio talk contribs 56,231 bytes −8 Changed label, description and/or aliases in pt
  • curprev 18:5218:52, 7 October 2024DG Regio talk contribs 56,239 bytes −77 Set a claim value: summary (P836): O objetivo do projeto é preparar 3 12775 ha de espaços industriais abandonados na cidade de Chorzów. Em especial, o âmbito dos trabalhos abrangidos pelo projeto inclui: 1. Extensão do sistema rodoviário – ul. Krakusa Nowa (a nova estrada será uma estrada interna), 2. Organização de tráfego permanente, 3. Abate de árvores, 4. Construção de redes de água, saneamento, chuva e gás, 5. Construção de uma parede de retenção 6. Iluminação de rua. O benefici...

20 March 2024

15 January 2024

13 December 2023

6 July 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:2921:29, 2 March 2023DG Regio talk contribs 54,273 bytes +1,483 Changed label, description and/or aliases in da, it, sk, es, lv, ga, el, bg, fi, fr, sl, et, sv, de, pt, ro, cs, hu, nl, lt, hr, mt, and other parts

21 October 2022

10 July 2022

  • curprev 19:2619:26, 10 July 2022DG Regio talk contribs 51,977 bytes +31,481 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

15 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 23:1423:14, 7 July 2021DG Regio talk contribs 11,308 bytes +104 Changed label, description and/or aliases in en: translated_label
  • curprev 23:1423:14, 7 July 2021DG Regio talk contribs 11,204 bytes +1,599 Created claim: summary (P836): The aim of the project is to prepare 3,12775 ha of brownfield investment sites in the city of Chorzów. In particular, the scope of the work covered by the project includes: 1. Extension of the road system – ul. Krakusa Nowa (the new road will be an internal road), 2. Permanent traffic organisation, 3. Felling trees, 4. Construction of water, sanitation, rain and gas networks, 5. Construction of a retaining wall 6. Street lighting. The beneficiar...

21 May 2021