Revision history of "Construction of a photovoltaic farm in Jaśliska III" (Q2711738)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 07:1107:11, 11 October 2024DG Regio talk contribs 67,912 bytes +6 Changed label, description and/or aliases in pt
  • curprev 07:1107:11, 11 October 2024DG Regio talk contribs 67,906 bytes +63 Set a claim value: summary (P836): O objetivo do projeto é aumentar a quantidade de energia obtida a partir de fontes renováveis, melhorando assim a qualidade e a proteção do ambiente e reduzindo as emissões de gases com efeito de estufa para a atmosfera. O projeto diz respeito à construção de uma exploração fotovoltaica com as infraestruturas necessárias em Jaśliska. Parâmetros fundamentais da instalação fotovoltaica: 1. Potência-199.68 kW 2. Quantidade de energia produzida – 179,71...

20 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

20 October 2022

10 July 2022

  • curprev 19:0619:06, 10 July 2022DG Regio talk contribs 64,367 bytes +40,409 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 22:5322:53, 7 July 2021DG Regio talk contribs 12,281 bytes +111 Changed label, description and/or aliases in en: translated_label
  • curprev 22:5322:53, 7 July 2021DG Regio talk contribs 12,170 bytes +2,026 Created claim: summary (P836): The aim of the project is to increase the amount of energy obtained from renewable sources, thereby improving quality and environmental protection, reducing greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic farm with the necessary infrastructure in Jaśliska. Basic parameters of photovoltaic installation: 1. Power-199.68 kW 2. Amount of energy produced – 179.71 MWhe/year. 3. The estimated annual...

21 May 2021