Revision history of "Photovoltaic installation of 199.8 kWp for COBI FACTORY S.A." (Q2711733)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

3 March 2023

  • curprev 00:4400:44, 3 March 2023DG Regio talk contribs 50,361 bytes −6,066 Changed label, description and/or aliases in it, da, sk, hr, et, ga, pt, lt, sv, de, lv, fi, fr, es, hu, el, cs, nl, sl, bg, mt, ro, and other parts

20 October 2022

10 July 2022

  • curprev 19:0619:06, 10 July 2022DG Regio talk contribs 55,611 bytes +34,263 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

14 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 22:5322:53, 7 July 2021DG Regio talk contribs 11,537 bytes +119 Changed label, description and/or aliases in en: translated_label
  • curprev 22:5322:53, 7 July 2021DG Regio talk contribs 11,418 bytes +1,676 Created claim: summary (P836): The aim of the project is to increase the amount of energy obtained from renewable sources, improve quality and environmental protection, increase the efficient use of solar energy, reduce greenhouse gas emissions into the atmosphere. The project concerns the construction of a photovoltaic installation with the necessary tooling on the roof of a building owned by Cobi Factory S.A., which will produce energy for the Applicant’s own needs.Paramete...

21 May 2021