Revision history of "Installation of PV Heaters up to 0.98 MW" (Q2711227)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:4116:41, 2 March 2023DG Regio talk contribs 78,818 bytes −831 Changed label, description and/or aliases in da, lv, it, bg, sk, et, ro, pt, hr, hu, cs, fr, sv, es, lt, de, ga, nl, sl, fi, mt, el, and other parts

20 October 2022

10 July 2022

  • curprev 18:5518:55, 10 July 2022DG Regio talk contribs 78,832 bytes +51,058 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, pl, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

18 December 2021

15 December 2021

4 December 2021

21 September 2021

26 July 2021

7 July 2021

  • curprev 22:4222:42, 7 July 2021DG Regio talk contribs 13,336 bytes +99 Changed label, description and/or aliases in en: translated_label
  • curprev 22:4222:42, 7 July 2021DG Regio talk contribs 13,237 bytes +2,572 Created claim: summary (P836): The project called “PV Giełczyn Installation with a capacity of up to 0,98 MW” concerns the construction of a new photovoltaic installation enabling the production of electricity by means of photovoltaic panels – devices converting solar radiation into electricity. Investment with a nominal capacity of 979,8 kWp is envisaged with connection to the distribution/transmission network in accordance with the technical documentation. The photovoltaic...

21 May 2021